Trial Assembly of Double Pump Assembly in
Sump Pit:

1. Connect the pump discharge pipe to the exterior dis-

charge pipe with the rubber coupling and clamp kit (Key
No. 2, Page 9). Do not tighten the clamps until all the final
adjustments are complete. See Figure 3.

NOTICE:

For 1-1/2” discharge pipe, remove the inner sec-

tion of hose from the rubber coupling.

2. Make the final adjustments. Make sure the pumps and the

switches do not interfere with each other. Make sure
there is plenty of room for the float switches to swing
from their “off” to their “on” positions.

Mark and Glue Assembly:

1. Mark the pipe and the fittings at all the connections with

a pencil. These marks will be used as a reassembly guide
while gluing to be sure that everything is still in the right
place and nothing has moved.

2. Loosen the rubber coupling and clamp connection.

3. Carefully pull the double pump assembly back out of the

pit. 

4. Take the tee assembly off of the primary discharge pipe.

Do not take the tee off of the threaded assembly.

5. Clean all the PVC pipe ends with the PVC cleaner.

Hazardous fumes.

Follow the cement and

cleaner manufacturers instructions. Use the PVC cement in
a well ventilated area away from fire or flames.

6. Glue the PVC fittings where indicated by the pencil

marks. Wait 10 minutes for the glue to cure.

Final Assembly:

1. Put the double pump assembly back into the pit. See

Figure 4.

2. Install and tighten the rubber coupling and clamp kit.

3. Make the final float switch adjustments and tighten the

cable ties.

ELECTRICAL CONNECTIONS

Hazardous voltage.

Can cause serious or

fatal electrical shock. Review safety instructions before op-
erating charge. Do not modify cord or plug.

5

Third Cut:
Cut out
overlap

plus 1/4"

Excess
discharge 
pipe

Exterior discharge 
pipe

Figure 4 – Make a third cut to remove the 
excess discharge pipe

Check
Valve

Grounded
Electrical
Outlet

12" Min.
(305mm)

7" Min.
(178mm)

(3") 

3546 1099 SRS

Check
Valve

Hose Coupling
with Clamps

Tether

Length

Discharge

Pipe

(Optional)

Figure 3 – Double pump and float switch

installation

Содержание Craftsman 390.307060

Страница 1: ...Instructions Before First Use of This Product Save This Manual For Future Reference Sears Roebuck and Co Hoffman Estates IL 60179 U S A Safety Instructions Operation Installation Troubleshooting Repa...

Страница 2: ...if ignored The word NOTICE indicates special instructions which are important but not related to hazards 1 To avoid risk of serious bodily injury due to electrical shock or burns and property damage d...

Страница 3: ...automobile battery may be temporarily substituted Be sure to replace the deep cycle marine battery as soon as possible Use of an automobile battery instead of a deep cycle marine battery in this syst...

Страница 4: ...f discharge pipe into the top of the tee If your pipe is 1 1 4 you will need to glue the reducer bushings into the tee and glue the pipe into the bushings Place the assembly on to the primary discharg...

Страница 5: ...ee assembly off of the primary discharge pipe Do not take the tee off of the threaded assembly 5 Clean all the PVC pipe ends with the PVC cleaner Hazardous fumes Follow the cement and cleaner manufact...

Страница 6: ...sor Controlle d 5 Sta ge battery charg er 12 VOLT 2 0 AM P Battery Operated Back up System Charging Charged Power Fault System Status Flashing RED LED Fault indicator See the Error Charge Table Table...

Страница 7: ...that begins with the prequalification test stage This occurs once the battery has been in the float charge stage for 28 days Special Features The charger is equipped with reverse battery short cir cui...

Страница 8: ...ction box of the system Motor hums but pump won t run 1 Check for low or defective battery Pump runs but pumps very little or no water 1 Make sure a check valve is installed and functioning be tween p...

Страница 9: ...Hose Insert 2 U74 68 Rubber Hose Coupling and Clamps 3 U78 846P PVC Tee 1 1 2 x 1 1 2 Slip x 1 1 4 FNPTW 1 1 4 4 U78 876P Reducer Bushing Requires 2 5 U37 66P PVC Pipe Nipple 1 1 4 NPT x Close 6 ZB90...

Страница 10: ...10...

Страница 11: ...11...

Страница 12: ...7 am 7 pm 7 days a week 1 800 366 PART 1 800 366 7278 For in home major brand repair service Call 24 hours a day 7 days a week 1 800 4 REPAIR 1 800 473 7247 For the location of a Sears Repair Service...

Отзывы: