Seametrics iMAG 4700 Скачать руководство пользователя страница 2

LT-14687r1.0 20201116 

11/16/2020

iMAG 4700

Mechanical Quick Start Guide

Seametrics • 19026 72nd Avenue South • Kent, Washington 98032 • USA 

(P) 253.872.0284 • (F) 253.872.0285 • 1.800.975.8153 • seametrics.com 

Grounding

Grounding

Metal Pipe

Plastic Pipe

Choose a position that will ensure a full pipe. 

Choose a position that will minimize flow distortion. 

5X

1X

2X

1X

5X

1X

Positioning

Positioning

Not Ideal:

Air bubbles and 

sediment on the

electrodes can affect 

accuracy

Recommended:

Improved accuracy 

results from 

unimpeded electrodes

Electrode moved from 

top by rotating meter

Intermittent air

bubbles miss electrode

Electrodes free from 

sediment build-up

Intermittent air

bubbles pass 

over electrode

Possible 

sediment 

build-up

Refer to the 

Electrical Quick Start Guide

 or the complete instruction manual for details on wiring.

Equalization Lug

Ground Clamp

(Exothermically weld when 

corrosion is a concern)

8’ Ground Rod

Earth

Grounding Ring

Gaskets

Grounding Ring

           Gaskets

#6, #8, or #12 AWG Stranded 

Copper Ground Wire < 5’

Plastic

Pipe

Plastic

Pipe

Equalization Lug

Meter 

Flange

Pipe 

Flange

Gasket
Pipe Flange

Flange Plate

Lockwasher

Metal Pipe

Metal Pipe

Meter Flange

Gaskets

Warnings

Warnings

• 

Do not weld or flame cut within 10’ of meter. Heat will 

damage electronics and liner. (Heat will void warranty.)

• 

Install provided full face gaskets.  

Failure to install gaskets 

will void warranty.

• 

Tube must be completely aligned with adjoining flanges.

• 

Ensure proper grounding.

• 

Bolts must be tightened evenly. Do not over tighten one side 

to fill a gap.

• 

Install security seal during installation if regulations require.

•   

Backup batteries are not intended as a primary power source.

Refer to instruction manual for further details.

Отзывы: