![Seametrics iMAG 4700 Скачать руководство пользователя страница 2](http://html1.mh-extra.com/html/seametrics/imag-4700/imag-4700_quick-start-manual_1227992002.webp)
LT-14687r1.0 20201116
11/16/2020
iMAG 4700
Mechanical Quick Start Guide
Seametrics • 19026 72nd Avenue South • Kent, Washington 98032 • USA
(P) 253.872.0284 • (F) 253.872.0285 • 1.800.975.8153 • seametrics.com
Grounding
Grounding
Metal Pipe
Plastic Pipe
Choose a position that will ensure a full pipe.
Choose a position that will minimize flow distortion.
5X
1X
2X
1X
5X
1X
Positioning
Positioning
Not Ideal:
Air bubbles and
sediment on the
electrodes can affect
accuracy
Recommended:
Improved accuracy
results from
unimpeded electrodes
Electrode moved from
top by rotating meter
Intermittent air
bubbles miss electrode
Electrodes free from
sediment build-up
Intermittent air
bubbles pass
over electrode
Possible
sediment
build-up
Refer to the
Electrical Quick Start Guide
or the complete instruction manual for details on wiring.
Equalization Lug
Ground Clamp
(Exothermically weld when
corrosion is a concern)
8’ Ground Rod
Earth
Grounding Ring
Gaskets
Grounding Ring
Gaskets
#6, #8, or #12 AWG Stranded
Copper Ground Wire < 5’
Plastic
Pipe
Plastic
Pipe
Equalization Lug
Meter
Flange
Pipe
Flange
Gasket
Pipe Flange
Flange Plate
Lockwasher
Metal Pipe
Metal Pipe
Meter Flange
Gaskets
Warnings
Warnings
•
Do not weld or flame cut within 10’ of meter. Heat will
damage electronics and liner. (Heat will void warranty.)
•
Install provided full face gaskets.
Failure to install gaskets
will void warranty.
•
Tube must be completely aligned with adjoining flanges.
•
Ensure proper grounding.
•
Bolts must be tightened evenly. Do not over tighten one side
to fill a gap.
•
Install security seal during installation if regulations require.
•
Backup batteries are not intended as a primary power source.
Refer to instruction manual for further details.