![Sealite SL-BR Скачать руководство пользователя страница 9](http://html.mh-extra.com/html/sealite/sl-br/sl-br_installation-and-service-manual_1227827009.webp)
SL-BR-AC
Up to 4NM Bridge Light - AC Model
Latest products and information available at
www.sealite.com
9
Unpacking, Installation, Wiring & Setup
Unpacking
Unpack all hardware and inspect for damage. If there is any damage, please contact your Sealite
Office. Retain original packing material for possible future use in shipping.
Installation & Wiring
Before proceeding with installation or service, make sure the following conditions are met:
• Ensure the tower or mast is grounded (NO RF HAZARD)
• Check the mast lighting circuit is not faulty
• Ensure power lines are not ‘live’ (NO ELECTRICAL HAZARD)
• Avoid touching live circuits!
NOTE:
• Make sure the mounting pole is vertically aligned to guarantee the required beam pattern of the
bridge light
• Make sure the light’s beam pattern is not disturbed by any nearby obstacles
• Ensure the cable gland is tightly sealed around the cable