background image

Latest products and information available at www.sealite.com

8

POSEIDON-1750 Ocean Buoy

Assembly Instructions

Check Components

•  Unload all components from crate or container.

•  Check all components are complete and correct. 

•  Position the POSEIDON Float Section (1) on flat level ground.

Prepare Tower Section

• 

Optional:

 Position the Lantern on the Tower section. For details on Lantern see Lantern 

Installation Manual. 

 

Note:

 Check for correct Lantern operation before fitting to the tower section.

• 

Optional:

 Position the Day Mark to the Mounting Plate and secure using 4 x M10 Socket Head 

Cap Screws, washers and Nuts.

Connect Tower & Mid Sections

•  Position the POSEIDON Tower (3) on top of the Hand Rail (8) and Mid Section (2).

 

o  Secure the Tower to the Mid Section. 

 

 

 

-  If Tower Section is fitted with Solar Panels, it will require 14 x M10 Stainless Steel 

Bolts, Nuts and Washers. 

 

 

 

-  If Tower Section is not fitted with Solar Panels then 18 x M10 Stainless Steel 

Bolts, Nuts and Washers are required.

 

o  Place a flat washer onto the bolt

 

o  Insert bolt into hole through Tower and Float Section

 

o  Secure a second Flat Washer, a Spring Washer and a Nut on to the Bolt

 

o  Tighten the Nut

Connect Tower/Mid Section to Float Section

•  Position the POSEIDON Tower and Mid Section Assembly to the Float Section (1)

 

o  Secure the Tower and Mid Section assembly to the Float Section using 16 x M10 

Stainless Steel Bolts, Nuts and Washers are required.

 

o  Place a flat washer onto the bolt

 

o  Insert bolt into hole through Tower and Float Section

 

o  Secure a second Flat Washer, a Spring Washer and a Nut on to the Bolt

 

o  Tighten the Nut

•  Fit 2 x Ø25mm Shackles to the Lifting Eyes on the Float Section.

•  Lift Buoy up to access the Lug Bushes at the base of the Buoy.

•  The buoy is now ready for the Mooring Assembly to be fitted.

Содержание POSEIDON-1750

Страница 1: ...Version 1 5 POSEIDON 1750 Ocean Buoy Installation Service Manual ...

Страница 2: ......

Страница 3: ...fications Page 5 Product Components Page 7 Assembly Instructions Page 8 Mooring Assembly Instructions Page 10 Mooring Diagram Page 11 Marine Buoy Maintenance Page 12 Sealite Buoy Warranty Page 13 Version No Description Date Approved 1 0 Manual Launch July 2009 K Paton 1 1 Individual Manual Nov 2009 A Dixon 1 2 Logo and Warranty Update July 2010 K Paton 1 3 Update Spec Table May 2012 J Dore 1 4 Bre...

Страница 4: ...sibility solution to marine navigation The Sealite buoy division provides turn key production of navigation buoys From tooling development raw materials selection and production to final testing and inspection Sealite guarantees superior quality and fast turn around times Sealite s buoy products are available in a wide range of configurations and sizes and can be economically shipped worldwide Why...

Страница 5: ...ng durable UV stabilized virgin polyethylene Stainless steel mooring bush POSEIDON 1750 Ocean Buoy The Sealite POSEIDON 1750 Buoy is rotationally moulded from UV stabilised virgin polyethylene and has been specifically designed to withstand the harsh marine environment and operate reliably with minimal maintenance Constructed from 3 parts a floatation section mid section and top section individual...

Страница 6: ...Latest products and information available at www sealite com 6 POSEIDON 1750 Ocean Buoy ...

Страница 7: ...2 POSEIDON Mid Section Cotton Reel 1 3 POSEIDON Tower Section 1 4 G316 S S Bolt M10x90mm Long 34 5 G316 S S Flat Washer 68 6 G316 S S Spring or Locking Washer 34 7 G316 S S Plain Nut 34 8 Handrail 1 9 Day Mark Mounting Plate 1 10 POSEIDON Lug Bushes 4 11 Galvanised Grade M Shackle Ø32mm with 35mm OD pin inside widtgh 60mm x 114mm 2 G316 S S Grade 316 Stainless Steel ...

Страница 8: ...nels it will require 14 x M10 Stainless Steel Bolts Nuts and Washers If Tower Section is not fitted with Solar Panels then 18 x M10 Stainless Steel Bolts Nuts and Washers are required o Place a flat washer onto the bolt o Insert bolt into hole through Tower and Float Section o Secure a second Flat Washer a Spring Washer and a Nut on to the Bolt o Tighten the Nut Connect Tower Mid Section to Float ...

Страница 9: ...d spills out through the small hole allowing the water to effectively drain from the buoy and at the same time preventing water from entering into the buoy through the small hole Installation Instructions for Breather Units For Products which Contain Sealite s Power Packs 1 Unscrew the white plug located at the side base of the buoy 2 Apply a small amount of marine grade silicon adhesive to the th...

Страница 10: ...le pin with nut and split pin Fit and secure 1 x Ø25mm Shackles with Ø29mm Pin and 1 x Ø25mm or larger Swivel Eye and Eye to the lower hole in the Bridal Plate Fit and secure the Bridal Plate and Chain assembly to the POSEIDON Connect the chain lengths using 2 x Ø25mm Shackles with Ø29mm Pins Secure the required length of chain to the Swivel Eye using 1 x Ø25mm Shackles with Ø29mm Pin Attach Moori...

Страница 11: ...Latest products and information available at www sealite com 11 POSEIDON 1750 Ocean Buoy POSEIDON 1750 Mooring Diagram ...

Страница 12: ...ual Maintenance Check and clear the tail and ride chains from shells and algae Check for wear on any shackle axis and check the tapered pins Any worn shackles must be replaced Check the free movement of each swivel around its head If any swivel head sticks it must be replaced Check every link of the thrash length of the chain Check the diameter of the nips and sides and also inspect the welds on e...

Страница 13: ...Latest products and information available at www sealite com 13 POSEIDON 1750 Ocean Buoy Refer to Sealite website www sealite com Sealite Buoy Warranty Notes ...

Отзывы: