Sealey TP6803 Скачать руководство пользователя страница 2

  3.  ASSEmbLY

3.1  Unpack and identify the parts shown in fig.1.

 

1. 

Handle

 

2. 

Pump Body

 

3. 

lower tube (with seal)

 

4. 

sliding Tube

 

5. 

Upper Tube

 

6. 

spout

 

7. 

Pivot bolts & nuts x 2

3.2  Assemble the spout (6) to the Pump Body (2). 

3.3  Attach the handle (1) to the plunger and   

 

pivot on the pump body using the pivot Bolts  

 

(7) as shown in fig.2. Choose the outer pivot  

 

hole on the handle (1) for the longest stroke.

3.4  Assemble the extendable dip tube as shown  

 

in fig.3. Firstly insert the lower tube with seal  

 

(3) into the bottom of the sliding tube (4). see  

 

fig.3A. Push on the lower tube so that it   

 

emerges from the top of the sliding tube as  

 

shown in fig.3B. screw the top of the lower  

 

tube (3) into the bottom of the upper tube (5).

 

screw the top of the upper tube (5) into the  

 

bottom of the pump body. see fig.3C.

3.5  Adjust length of dip tube and insert into   

 

container. screw base of pump into container  

 

opening. The unit is now ready for pumping.

NOTE: It is our policy to continually improve products and as such we reserve the right to alter data, specifications and component parts without prior notice.

ImPORTANT: 

No liability is accepted for incorrect use of this product. 

WARRANTY: 

Guarantee is 12 months from purchase date, proof of which will be required for any claim. 

INFORmATION:

 For a copy of our latest catalogue and promotions call us on 01284 757525 and leave your full name and address, including postcode.

01284 757500

01284 703534

[email protected]

Sole UK Distributor, Sealey Group, 

Kempson Way, suffolk Business Park

Bury st. Edmunds, suffolk,

IP32 7AR

www.sealey.co.uk

Web

email

Original Language Version

TP6803    Issue No:1 - 06/07/10

fig.3

Отзывы: