4.1.1.
First, place the cushion fig.1.4 on the indicated position on the steel plate fig.3 and align the 4 holes of the cushion.
4.1.2.
Position the body of the assist arm on the cushion and use the bolts fig.1.5 to fix See fig.4, fig.5, fig.6.
4.1.3.
Remove the hose from the end of the air source fitting and use a small section of the Ø8PU hose to connect the tee with the outlet as
shown in fig.7.
4.1.4.
Insert one end of the Ø8PU hose fig 1.1 into the Y Tee and another end connected with the inlet
of the pressure adjust valve of the
assist arm.
4.1.5.
Use part fig.1.7. to fix the part fig.1.8 on the corresponding position on the assist arm column and tighten. Use part fig.1.6 to fix the
part fig.1.9 together with the part fig.1.8 and tighten fig.8.
4.1.6.
Adjust the assist arm column to ensure that it is vertical: Loosen/tighten bolts fig.1.5 to adjust the column to the vertical. After
adjustment, tighten all four bolts.
fig.3
fig.4
fig.5
fig.6
fig.7
fig.8
fig.9
fig.10
t
C10A | Issue 1 06/02/18
Original Language Version
© Jack sealey limited