Sealey SSCL4 Скачать руководство пользователя страница 3

NOTE: It is our policy to continually improve products and as such we reserve the right to alter data, specifications and component parts without prior notice.

IMPORTANT: 

No liability is accepted for incorrect use of this product. 

WARRANTY: 

Guarantee is 12 months from purchase date, proof of which will be required for any claim. 

INFORMATION:

 For a copy of our latest catalogue and promotions call us on 01284 757525 and leave your full name and address, including postcode.

01284 757500

01284 703534

[email protected]

Sole UK Distributor, Sealey Group, 

Kempson Way, Suffolk Business Park

Bury St. Edmunds, Suffolk,

IP32 7AR

www.sealey.co.uk

Web

email

5.9

   Take 2 of the 6 rung end frames, F and 3 diagonals B. Position a  

 

diagonal on the 4th rung of each frame but on opposite sides.    

 

(WARNING : Make sure that everything is the right way round  

 

as per the sketch!)

5.10

   Position the end frames on to frame below and fix the 2 diagonals  

 

B hanging from the frames into position. Make sure that the 

 

butterfly locking part is completely rotated to hold the diagonal    

 

firmly in position. Insert the frame locking pins.

5.11

  Position a platform H on the 11th rung and lock in place.

5.12

  Climb through the trapdoor, sit on the edge and position the two

 

horizontal braces C on the 13th rung from the bottom and the 2   

 

braces C on the 15th rung. Lock the snaplocks firmly in position.

5.13

   Attach a diagonal B onto the lower rung of one of the two-rung

 

guardrail end frames D.

5.14

  Position the first two-rung guardrail end frame D (without the

 

diagonal) on the base and then put the two-rung guardrail end    

 

frame D already equipped with the diagonal on the other side of  

 

the base. Fix the diagonal in place on the 17th rung. Make sure   

 

that the butterfly locking part is completely rotated to hold the    

 

diagonal firmly in position. Insert the frame locking pins.

5.15

  Climb down to the lowest platform and sitting in the access hatch

 

remove the 4 horizontal braces from rungs 7 and 9 and pass    

 

them to the ground.

5.16

   Climb to the ground and remove the lower platform.

5.17

   Ascend to the platform on rung 11 and reposition the other 

 

platform on the 18th rung from the bottom. Lock the windlocks    

 

securely.

5.18

   Climb through the trapdoor, sit on the edge and position the two  

 

lower horizontal braces C on the 2nd rung from the top. Lock the  

 

snaplocks firmly in position . Remaining seated in the same 

 

position, put the other two rails C into position on the top-most    

 

rungs. Lock the snaplocks firmly into position.

5.19

  Lastly install the toeboards E.

 

Lock all wheels prior to using the scaffold; ensure that the 

 

stabiliser legs are secure and firmly seated on the ground.

SSCL4    Issue No.1 - 08/06/10

SSCLI + SSCL3 + SSCL4

Отзывы: