Sealey SDL7.V2 Скачать руководство пользователя страница 2

2.  INTRODUCTION

 

Professional Lithium-ion cordless soldering iron. Ideal for multiple applications including automotive soldering in-and-around engine  

 

bays. Heats up to working temperature in 25 seconds. Integral LED work lights (x2). Auto shut-off after 10mins. Unit features a sturdy  

 

base stand and is supplied with a mains charger. Maximum Temperature: 450°C.

3.  SPECIFICATION

Model No:.....................................................................SDL7

Battery: ..........................................................4V 1.5Ah Li-ion

Charging time:...................................................................3hr

Maximum temperature ................................................. 450

o

C

Operating time ............................................................. 50min

Power rating ......................................................................8W

IMPORTANT WARRANTY INFORMATION

T

he battery fitted to this iron is considered to be a consumable item and its ability to accept a charge will reduce over time.

We will provide warranty against mechanical and electrical defect for a period of one year - this does not cover fair wear and tear.

I

f the battery is not properly charged before first use, or regularly conditioned, its capacity will diminish. Under these circumstances we will 

not replace the battery regardless of whether it is less than one year old.

NOTE:

 The lithium battery does not suffer from memory effect and once fully charged may be stored for up to six months without another 

charge.

4.  OPERATION

4.1.    

Plug in charger and ensure that the soldering iron is fully 

 

charged before first use. The battery charge indicator (fig.1) is 

 

red when charging and green once fully charged.

4.2.    

To switch on, remove the soldering iron from the charging dock 

 

and press the On/Off button (fig.1). The two work lights will 

 illuminate.

4.3.    

Hold down the On/Off button, the soldering tip warms up and 

 

the battery charge / state indicator will glow red until the tip 

 

is up to temperature. When the tip reaches the working 

 

temperature the light will glow green.

4.4.    

The tip will maintain the working temperature for 10 minutes 

  

and the green light will show in the state indicator after which 

 

it will turn off. 

4.5.    

To recommence soldering, after a brief period, repeat 

 

4.2, 4.3 and 4.4.

 

Original Language Version

© Jack Sealey Limited

fig.1

Sealey Group, Kempson Way, Suffolk Business Park, Bury St Edmunds, Suffolk. IP32 7AR

 01284 757500 

 01284 703534 

 [email protected] 

 www.sealey.co.uk

ENVIRONMENT PROTECTION

Recycle unwanted materials instead of disposing of them as waste. All tools, accessories and packaging should be sorted, taken to 
a recycling centre and disposed of in a manner which is compatible with the environment. When the product becomes completely 
unserviceable and requires disposal, drain any fluids (if applicable) into approved containers and dispose of the product and fluids 
according to local regulations.

WEEE REGULATIONS

Dispose of this product at the end of its working life in compliance with the EU Directive on Waste Electrical and Electronic Equipment 
(WEEE). When the product is no longer required, it must be disposed of in an environmentally protective way. Contact your local solid 
waste authority for recycling information.

Note

: It is our policy to continually improve products and as such we reserve the right to alter data, specifications and component parts without 

prior notice.

Important

: No Liability is accepted for incorrect use of this product.

Warranty

: Guarantee is 12 months from purchase date, proof of which is required for any claim.

BATTERY REMOVAL

Under the Waste Batteries and Accumulators Regulations 2009, Jack Sealey Ltd are required to inform potential purchasers of 
products containing batteries (as defined within these regulations), that they are registered with Valpak’s registered compliance 
scheme. Jack Sealey Ltd’s Batteries Producer Registration Number (BPRN) is BPRN00705.

SDL7.V2          Issue 1            13/11/2020

Отзывы: