6.6.10. 

display will show 

‘std’

 if this is the required Application then exit ‘application mode’ by 

touching       twice. To change to 

‘tir’

 or    

 

‘n2P’

 touch (+) And use to (-) change back to 

‘std’

.

6.6.11. 

C

onfirm the application 

‘std’

‘tir’

 or 

‘n2P’

 by touching.

6.6.12. 

display shows 

‘aPP’

 exit the application by touching       twice.

6.6.13. 

T

he QUBE will reboot into the desired application and will remain in this mode until an alternative application is required.

6.7.    

tyre shoP (tir) oPeration: inflation anD Deflation

6.7.1. 

  

Set desired pressure, by touching either        or 

6.7.2. 

  

Connect the hose to the tyre.

6.7.3.   

Automatic inflation will commence to the set pressure, periodically stopping to display the pressure

 of the tyre.

6.7.4.   

If the pressure in the tyre is below 3 psi, 0.3 bar or 30 kpa, the process will not commence until      is touched.

6.7.5.   

When the Set pressure is reached, the buzzer will sound and the display will show ‘

enD

’ with the final pressure. Red LED light will  

 

flash.

6.7.6.   

Remove the hose from tyre.

6.8.    

to enable setting of oPs

6.8.1. 

  

Touch       and display will toggle 

‘oPs’

 and blank value.

6.8.2.   

Increment the OPS value between 0-29 psi, 0-2 bar, by touching       and       , to accept the value, touch 

6.8.3.   

Display will revert to the Set pressure previously selected.

note:

  The OPS value will not be applied when the tyre has a pressure of more than 3 psi, 0.2 bar.

 

To prevent the accidental use of OPS, the OPS setting is not retained after the machine is powered down.

 

Use of oPS: 

 

The OPS value is added to the final target pressure setting to give the Over Pressure.

 example: 

 

A Final Set pressure of 32 psi, 2.2 bar is required with an OPS value of 15 psi, 1 bar. The tyre will now inflate from flat condition    

 

only to the value of 47 psi, 3.2 bar.

 

Once the OPS value has been achieved, the unit will deflate back to the desired set pressure.

 

For adjustments to Inflators parameters please refer to your Distributor or Sealey.

 

‰

   warning!

 When using the OPS function, the sum pressure must not exceed the tyre manufactures maximum inflation pressure.

6.9.    

n2 (n2P) oPeration; inflation anD Deflation (tyre toP off)

6.9.1. 

  

Set desired pressure, by touching either       or 

6.9.2. 

  

Connect the hose to the tyre.

6.9.3. 

  

The process will not commence until       is touched.

6.9.4. 

  

When the Set pressure is reached, the buzzer will sound and the display will show 

‘enD’

 with the final pressure. Red LED will flash.

6.9.5.   

Remove the hose from tyre.

6.10. 

tyre Purging (n2 conversion)

6.10.1. 

Set desired pressure, by touching either        or

6.10.2. 

Connect the hose to the tyre.

6.10.3. 

The process will not commence until       is touched.

6.10.4.  If the pressure in the tyre is below 3 psi, 0.3 bar or 30 kpa, the process will start but perform only one purge (since the tyre is  

 

 

already flat).

6.10.5. 

during the purging process the display will show the last pressure check point and the number of purging cycles completed when  

 

deflating.

6.10.6. 

When the set pressure is reached, the buzzer will sound and the display will show 

‘enD’

 with the final pressure. Red LED will flash.

6.10.7. 

R

emove the hose from tyre.

note:

 

• In N2 (

n2P

) Operation the QUBE will not commence inflation until       is touched for tyre top off or        for N2 Conversion.

 

• For N2 conversion of existing tyres the number of purge cycles is defaulted to 2.

 

• For flat tyre purging the number of cycles is reduced by 1, as the tyre is already empty.

 

• The lower purge pressure limit is defaulted to the greater of 10% of the set pressure or 3 psi, 0.2 bar, 20 kpa.

 

For adjustments to Inflators parameters please refer to your Distributor or Sealey.

6.11.   

n2 conversion of existing tyres

 

For normal use a Purity level of between 93% and 96% N2 is sufficient for most road tyres.

 

If your N2 Generation source is greater than 97% then it is sufficient to leave the default setting of 2 Purges.

 

For N2 Generation sources less than 97%, then to achieve the required N2 % Purity, consider adding additional Purge cycles.

 

For adjustments to Inflators parameters please refer to your Distributor or Sealey.

 

The Final N2% concentration can be periodically checked using a N2% concentration meter.

6.12. 

user insPection MoDe

 

It is possible to set the inflator to act as a pressure gauge.

 

The display resolution is changed and can be used to reference the inflator against a calibrated pressure source. The inflator  

 

 

automatic cycle is inhibited.

6.13. 

to access:-

6.13.1. 

Touch        and        together.

6.13.2. 

T

he QUBE

 will beep but the display will not change.

6.13.3. 

T

ouch      5 times (if this is not undertaken within 10 seconds, the Inflator reverts back to normal Inflator mode).

6.13.4. 

d

isplay will show the pressures to the minimum resolution: psi = 0.1 / Bar = 0.01 / kpa = 1 / kg/cm = 0.01.

6.13.5. 

Connect the hose to the tyre and the display will show the pressure in the tyre.

6.13.6. 

When complete, touch any button to return to the last set mode.

S

A390 Issue 1 02/07/19

Original Language Version

© Jack Sealey limited

Содержание SA390

Страница 1: ...ns to the product will be deemed to be improper use The manufacturer is not liable for damages caused by improper use the risk lies solely with the user 9 9 Proper use of the product also implies the observance of the manufacturers instructions with regard to installation start up operation and maintenance 9 9 All works concerning installation start up adjustment and maintenance must be made by qu...

Страница 2: ... N2P Operation are required then follow the Application Mode Selection 6 3 3 The QUBE will reboot into the desired application and will remain in this mode until an alternative mode is selected with Application Mode Selection 6 4 Standard Std Operation Inflation and deflation 6 4 1 Set desired pressure by touching either or 6 4 2 Connect the hose to the tyre 6 4 3 Automatic inflation will commence...

Страница 3: ... pressure Red LED will flash 6 9 5 Remove the hose from tyre 6 10 Tyre Purging N2 conversion 6 10 1 Set desired pressure by touching either or 6 10 2 Connect the hose to the tyre 6 10 3 The process will not commence until is touched 6 10 4 If the pressure in the tyre is below 3 psi 0 3 bar or 30 kpa the process will start but perform only one purge since the tyre is already flat 6 10 5 During the ...

Страница 4: ...y New sensor required Refer to authorised repairer E9 Pressure sensor failure high New sensor required Refer to authorised repairer LO Under voltage Check power supply HI Over voltage Refer to authorised repairer E12 Checksum corrupted New PCB required Refer to authorised repairer E13 Lost or corrupted calibration settings New PCB required Refer to authorised repairer E17 Calibration data corrupte...

Отзывы: