background image

4.2.6. 

  

Lay cover over frame work ensuring the correct outer surface is on the outside (fig6). Slide the sleeves inside the cover over the open  

 

ends of the assembly (fig6). Pass the last top bar (fig4.C) through the sleeve on the cover and connect to main assembly.

4.2.7. 

  

Fold the cover backwards over the frame and from the inside, wrap the internal velcro fasteners onto the framework.

4.2.8. 

  

Mark off the location for the rawl bolt ground fixings and install if required. 

Sealey Group, Kempson Way, Suffolk Business Park, Bury St Edmunds, Suffolk. IP32 7AR

 01284 757500 

 01284 703534 

 [email protected] 

 www.sealey.co.uk

ENVIRONMENT PROTECTION

Recycle unwanted materials instead of disposing of them as waste. All tools, accessories and packaging should be sorted, taken to 
a recycling centre and disposed of in a manner which is compatible with the environment. When the product becomes completely 
unserviceable and requires disposal, drain any fluids (if applicable) into approved containers and dispose of the product and fluids 
according to local regulations.

Note

: It is our policy to continually improve products and as such we reserve the right to alter data, specifications and component parts without prior 

notice.

Important

: No Liability is accepted for incorrect use of this product.

Warranty

: Guarantee is 12 months from purchase date, proof of which is required for any claim.

Original Language Version

© Jack Sealey Limited

Parts support is available for this product. Please log on to  

www.sealey.co.uk, email [email protected] or telephone 01284 757500

MCS01    Issue 2  11/03/19

fig.6

Отзывы:

Похожие инструкции для MCS01