background image

5.1.3. 

  

Select dowel size and relevant drill bit. Set the depth gauge on the drill bit to ensure sufficient hole depth to prevent the dowel from  

 

bottoming out when jointing thus preventing the boards from fully meeting. drill both upper and lower holes at this position.

 

Tip: 

to prevent build up of swarf, withdraw the drill bit from  the work frequently.

5.1.4. 

  

To continue drilling further holes, loosen the drill jig clamps and carefully slide the drill jig to it’s new position. 

Tip:

 spacing can be  

 

achieved by placing a dowel into an existing hole and using a spacer-block between this and the drill-jig to set the new location. 

 

iMporTanT:

 When moving the drill jig location at least one set of clamps must be holding the boards in position to prevent movement  

 

and misalignment of the dowels. 

5.2. 

  

EDGE TO CORNER JOINTING (fig.2)

5.2.1. 

  

Clamp the first board in position on the work bench using drill jig (fig.2.A) and clamp block (fig.2.B) thus setting the location for the first  

 

dowel hole.

5.2.2.   

stand the second board on edge onto the drill jig and secure with upper clamps.

 Tip: 

support the vertical board securely so that the  

 

boards lie at right angles to each other and ensure that edges are in line. Additional clamping maybe required to securely and firmly  

 

support the vertical board.

5.2.3. 

  

Select dowel size and relevant drill bit. Set the depth gauge on the drill bit to ensure sufficient hole depth to prevent the dowel from  

 

bottoming out on jointing thus preventing the boards from fully meeting. drill all  holes in the horizontal board. 

Tip:

 spacing can be  

 

achieved by placing a dowel into an existing hole and using spacer-block between this and the drill-jig to set the new location.

5.2.4.   

re-adjust drill depth gauge to suit hole depth required in vertical board. to continue drilling further holes, loosen the drill jig clamps  

 

and carefully slide the drill jig to it’s new position. 

Tip:

 Alignment of upper and lower holes can be achieved by using a dowel placed in  

 

matching horizontal hole (fig.2C)  

Tip: 

to prevent build up of swarf, withdraw the drill bit from the work frequently. 

 

 

iMporTanT:

 When moving the jig location at least one set of clamps must be holding the boards in position to prevent movement and  

 

misalignment of the dowels. 

 

Original Language Version

© Jack sealey limited

dJ01            issue 1 24/01/18

fig.1

fig.2

Отзывы: