OPERATION
MANUAL
Product:
Document #:
Rev:
Page:
SEAKEEPER 26 / 20HD
90266
7
1 of 11
Section 2: SYSTEM OPERATION
2.0 Introduction
This section describes operation of the Seakeeper 26 system.
2.1 Display Screens: Overview
1) When 24 VDC is applied to the Seakeeper the DISPLAY will power up and initialize. The
SPLASH screen will be displayed.
2) After the DISPLAY has initialized the HOME screen will be displayed.