www.seagullmodels.com
7
Rudder control horn.
Hinge.
1) Locate the items necessary to install the
engine mount included with your model. .
ENGINE MOUNT INSTALLATION.
4x30mm.
2) Use four 4x30mm head bolts and four 4mm
washers to attach the engine mount rails to
the firewall. Tighten the screws . Make sure to
use threadlock on the screws to help prevent
them from vibrating loose.
3) Carefully bend the second nylon tube
up at a 45º angle. This tube is the vent tube.
1) Using a modeling knife, carefully cut
off the rear portion of one of the 3 nylon tubes
leaving 1/2” protruding from the rear of the
stopper. This will be the fuel pick up tube.
INSTALLING THE STOPPER ASSEMBLY.
Thread locker glue.
2) Using a modeling knife, cut one length
of silicon fuel line. Connect one end of the line
to the weighted fuel pick up and the other end
to the nylon pick up tube.(The silicon tube is
not included).
Vent tube.
Fuel pick up tube.
Fuel fill tube.