7
www.seagullmodels.com
INSTALL ELEVATOR CONTROL
HORN.
Epoxy
Epoxy
Aileron control horn.
INSTALL RUDDER CONTROL HORN.
Epoxy.
Repeat steps to install the rudder control horn
as same as steps done for ailerons.
Rudder control horn.
Thread locker glue.
ENGINE MOUNT INSTALLATION.
1) Locate the items necessary to install the
engine mount included with your model. .
2) Use four 4x30mm head bolts and four 4mm
washers to attach the engine mount rails to
the firewall. Tighten the screws . Make sure to
use threadlock on the screws to help prevent
them from vibrating loose.
4x30mm.
Fiberglass control horn.
Fiberglass control horn.