27
INSTALL RUDDER CONTROL HORN.
Repeat steps to install the rudder control
horn as same as steps done for elevator.
Rudder fiberglass control horn.
Epoxy.
Fiberglass control horn.
INSTALLING THE HORIZONTAL
STABILIZER.
1) Using a ruler and a pen, locate the
centerline of the horizontal stabilizer, at
the trailing edge, and place a mark. Use a
triangle and extend this mark, from back
to front, across the top of the stabilizer.
Also extend this mark down the back of
the trailing edge of the stabilizer.
2) Using a modeling knife, carefully re-
move the covering at mounting slot of
horizontal stabilizer ( both side of fuse-
lage).
Cut.
Draw center line
3) Slide the stabilizer into place in the
precut slot in the rear of the fuselage.
The stabilizer should be pushed firmly
against the front of the slot.
Содержание JU-87 STUKA
Страница 4: ...JU 87 Instruction Manual 4 HINGING THE FLAP ...
Страница 11: ...11 2mm 2mm ...
Страница 12: ...JU 87 Instruction Manual 12 2mm 3x10mm ...
Страница 13: ...13 2mm 3x10mm ...
Страница 14: ...JU 87 Instruction Manual 14 INSTALLING THE BOMB ON THE WINGS Epoxy Epoxy ...
Страница 15: ...15 Epoxy ...
Страница 19: ...19 5x100 mm 8mm Blind nut 6 5 mm 6 5 mm ...
Страница 32: ...JU 87 Instruction Manual 32 TAIL STRUTS INSTALLATION Epoxy ...
Страница 33: ...33 SIDE FORCE GENERATOR OF STABILIZER ASSEMBLY Epoxy Epoxy ...
Страница 37: ...37 Receiver Battery ATTACHMENT WING FUSELAGE Wing bolt 6x6mm ...