
GROB TUTOR G115
Instruction Manual.
28
INSTALLATION PILOT.
1) A scale pilot is included with this ARF. The
Seagull Pilot included fitting well to the cockpit.
(or you can order others scale pilot figures
made by Seagull factory. They are available at
Seagull distributors.)
If you are going to install a pilot figure, please
use a sanding bar to sand the base of the figure
so that it is flat.
2) Position the pilot figure on the canopy floor
as show. Locate the oval shaped on the canopy
floor and remove the covering. Use epoxy to
glue this into the base of the pilot figure, please
see pictures as shown.
1
2
Elevator control horn.
Rudder control horn.
Wire keeper.
3
Rudder pushrod.
Elevator pushrod.
RUDDER PUSHROD HORN
INSTALLATION.
Pen.
8mm
Snap keeper.
M2 lock nut.
Metal clevis.
8mm.