background image

4–TEC SC Models

DELIVERY TO CUSTOMER

General Instructions

Explain to customer:

- Operator’s guide
- Watercraft operation
- Maintenance
- Safety features
- On-product labels
- Warranty
- Where possible, give a brief demo ride and

explain watercraft operation.

Explain, complete and return:

- The WARRANTY REGISTRATION CARD (legal

requirement).

Give to customer:

- Operator’s guide
- Safety videocassette
- Ask the customer to sign the

Predelivery

Check List

.

Fuel System

This procedure should be explained to the

customer:

- It might be necessary to remove and install

the safety lanyard 2 or 3 times to initially feed
the fuel system.

Handlebar Tag

N

N

N

NO

O

O

OT

T

T

TE

E

E

E::::

A tag is tied to the handlebar. Let it in place

until delivery and make sure purchaser reads it.

Break-In Period

With Sea-Doo watercraft powered by Rotax

®

engines, a break-in period of 10 hours is required
before continuous operation at full throttle. To
achieve a good break-in, vary the engine speed
every few minutes with brief wide open throttle
accelerations of up to 15 seconds. Continued wide
open throttle runs and prolonged cruising without
speed variations should be avoided, this can cause
engine damage during the break-in period.

N

N

N

NO

O

O

OT

T

T

TE

E

E

E::::

Never add oil in fuel tank during break-in

period.

Predelivery

2004-1

13 / 15

Содержание Bombardier GTX 4-TEC

Страница 1: ...ri 5 Access Door 5 FINAL PREPARATION 5 Steering Alignment 5 O P A S System Alignment 6 Recommended Fuel 6 Fuel System Pressurization 7 Coolant Level 7 Watercraft Identification 8 Programming Keys With...

Страница 2: ...tions and or specifications in this document Bombardier reserves the right at any time to discontinue or change specifications designs features models or equipment without incurring obligation The ill...

Страница 3: ...t or back of the watercraft Raise cover vertically 2 from both ends at the same time Remove parts from the watercraft s rear storage compartment Lifting the watercraft 1 3 2 F08A056 Cut strapping at w...

Страница 4: ...flat washer from section no 1 of predelivery kit 1 nut from section no 1 of predelivery kit Secure the BLACK negative cable to the battery negative post with 1 hexagonal bolt from section no 1 of pre...

Страница 5: ...eviously removed Torque to 21 N m 15 lbf ft Access Door 1 F02L3X7 Open the front storage compartment cover Remove the storage tray Secure the access door 1 with 7 plastic darts from section no 2 of pr...

Страница 6: ...uel Fuel type RECOMMENDED Premium unleaded gasoline with 91 octane RON MON 2 specification for optimum performance MINIMUM Regular unleaded gasoline with 87 octane RON MON 2 specification At predelive...

Страница 7: ...System Pressurization WARNING At PDI whenever doing any type of repair on the watercraft or if any components of the fuel system are disconnected a pressure test must be done before starting the engi...

Страница 8: ...watercraft identification or to program a safety lanyard use Bombardier Utility and Diagnostic Software B U D S in conjunction with the VCK N N N NO O O OT T T TE E E E Make sure to use B U D S versio...

Страница 9: ...ea Doo Learning Key white key with Sea Doo LK written on it click on ADD LEARNING KEY 2 button on bottom of screen N N N NO O O OT T T TE E E E This key limits vehicle top speed to approximately 55 km...

Страница 10: ...TION Never run engine longer than 5 minutes Drive line seal has no cooling when watercraft is out of water 1 3 2 F18D2N6 Reinstall dipstick push in completely Remove dipstick and read oil level It sho...

Страница 11: ...late s a slight play should be obtained With the throttle lever released it must have a free play of 0 5 4 mm 1 64 5 32 in in the cable CAUTION Improper cable adjustment will cause strain on cable and...

Страница 12: ...pump and engine Complete Predelivery Check List Test run watercraft DELIVERY TO CUSTOMER Decal Protective Films N N N NO O O OT T T TE E E E Protective film on decals must be removed Slowly peel off p...

Страница 13: ...ety lanyard 2 or 3 times to initially feed the fuel system Handlebar Tag N N N NO O O OT T T TE E E E A tag is tied to the handlebar Let it in place until delivery and make sure purchaser reads it Bre...

Страница 14: ...ition TPS 1 6 k 2 4 k Crankshaft Position CPS 190 290 Manifold Air Temperature MATS 2 280 k 2 740 k 20C Water Temperature WTS 2 280 k 2 740 k Manifold Air Pressure MAPS 6040 terminals 2 1 5554 termina...

Страница 15: ...ing Nozzle Pivoting Angle 0 to 20 Minimum Required Water Level 90 cm 35 in Outside Diameter 155 3 mm 6 115 in Impeller Material Stainless steel L L L LI I I IQ Q Q QU U U UI I I ID D D DS S S S Fuel T...

Отзывы: