For questions or help with the installation, please call SDHQ Offroad @ 480-633-2929
Mon.
–Fri. 8:00am–5:30pm and Sat. 8:00am–3:30pm Arizona Time. www.sdhqoffroad.com
Page
2
of
6
Страница 1: ...0pm Arizona Time www sdhqoffroad com Page 1 of 6 Product Packing List Product SDHQ 53 1140 G3 Description 14 20 Tundra Switch Pros Power Module Mount 1 SDHQ Power Module Mount Plate SDHQ 53 1140 G3 A...
Страница 2: ...For questions or help with the installation please call SDHQ Offroad 480 633 2929 Mon Fri 8 00am 5 30pm and Sat 8 00am 3 30pm Arizona Time www sdhqoffroad com Page 2 of 6...
Страница 3: ...ule Mount it may be easier to remove the battery Optional Relay Pack Upgrade is purchased separately Approx install time 1 hour not including wiring Parts List Hardware List Required Tools Standard Mo...
Страница 4: ...TO FINISH BEFORE BEGINNING INSTALLATION Installation Instructions 1 Place the Switch Pros Power Module on top of the SDHQ Switch Pros Power Module Mount as pictured Using the Switch Pros included hard...
Страница 5: ...itch Pros power module is mounted but BEFORE it is connected to anything else do the following 1 Reinstall battery if battery was removed during installation and secure factory connections Start vehic...
Страница 6: ...30pm and Sat 8 00am 3 30pm Arizona Time www sdhqoffroad com Page 6 of 6 Double check all hardware is installed correctly and tight Re torque ALL bolts after 100 miles 190 S McQueen Rd Ste 109 Gilbert...