6
Proper mounting preparation will ensure a great
installation. Mounting brackets must be level to each
other, as well as plumb. They must be screwed into
structural members of some kind, such as ceiling
joists or wall studs. You may use the wood screws
provided, or other anchors (not provided) capable of
carrying the load, that is suitable to the substrate.
DO NOT MOUNT TO HOLLOW SHEET ROCK.
1. The drop is adjustable in the field between 0'' and
the MAX DROP (12'', 24'', or 36'',
2'' for short throw
)
ordered for your screen. Use the drawing (refer to
pg. 7) to pick a bracket height that will allow you to
extend your screen to achieve the desired vertical
position of your viewing area.
INSTALLATION
Solo/Pro 2 - Installation
Содержание Solo 2
Страница 1: ...Solo Pro 2 Installation Instructions 110v AC Motors ...
Страница 4: ......
Страница 35: ...31 ...