Scotsman FME2400RH Скачать руководство пользователя страница 19

REMOVAL AND REPLACEMENT: Bearing And Breaker

Note: Removal of the auger, water seal,
evaporator and gearmotor must begin at the top of
the assembly.
To Remove the Breaker Bearing Assembly:

1. Remove panels and disconnect electrical power.
2. Push back bail clamp, remove insulation
retaining strap and insulation, remove ice chute
cover.
3. Unscrew and remove ice sweep.
4. Loosen band clamp under ice chute, lift up and
remove ice chute.
5. The breaker may be removed from the auger
and evaporator without disturbing the auger.

a. Unscrew breaker cover from breaker (left hand

threads)

b. Unscrew auger stud from top of auger.
c. Unscrew 4 allen head cap screws holding

breaker to evaporator.

d. Lift up, and remove breaker/bearing assembly
from auger & evaporator.
6. Service the bearing. Check for rust, rough spots
and damage.

a. The bearing is pressed into the breaker, to

remove the bearing and replace it an arbor press
is needed.

b. Replace lower seals before installing new

bearing in breaker.
Note: seals must be pressed in with a tool pushing
against the outer edge only, they will not install by
hand.
Replace parts as required. Re-grease bearing with
Scotsman part no. 19-0609-01 bearing grease.
Replace top seal, and check the o-rings, replace if
cut or torn.
7. Reverse to reassemble: specific tools and
materials are required to install properly.
a. Add food grade grease such as Scotsman part
number 19-0569-01 to the seal area before
installing on the auger.
b. Check the seal to shaft areas for cuts, or rough
spots: none are permitted.

Step 5- a

Step 5-b

Step 5-c and Step 6

ICE SWEEP

BREAKER

COVER

AUGER

STUD

BEARING

SEALS

SLOTTED

COLLAR

DIVIDER

Electrical Shock Hazard
Electrical shock can cause
personal injury.
Disconnect electrical
power before beginning.

FME2400RH

January 1995

Page 19

Содержание FME2400RH

Страница 1: ...IDENTIFICATION Page 8 COMPONENT DESCRIPTION Control Box Page 9 COMPONENT DESCRIPTION Evaporator Page 10 ELECTRICAL SEQUENCE Page 11 OPERATION Page 12 OPERATION Refrigeration Page 13 MAINTENANCE AND CL...

Страница 2: ...t regard for safety and performance They meet or exceed the standards of U L N S F and C U L Scotsman assumes no liability or responsibility of any kind for products manufactured by Scotsman that have...

Страница 3: ...bin extension top edge and using a mechanical lift install the FME2400RH onto the top of the storage bin assembly Fasten the ice machine to the bin using 4 5 15 18 2 5 cap screws Level the assembly by...

Страница 4: ...iagram The ice machine should be connected to it s own electrical circuit and be individually fused Voltage when the unit is under full load must remain within the limitations listed on page 2 LOW VOL...

Страница 5: ...een the ice maker and the water supply Drain System All drains are of the gravity type and must have a minimum of 1 4 fall per foot of horizontal run The drains must be installed to conform to local p...

Страница 6: ...removed from inside the cabinet 6 Have the electrical connections been made 7 Have the drains been installed and checked for leaks 8 Has the refrigeration supply been installed and checked for leaks 9...

Страница 7: ...make ice Water flows from the water reservoir and the float drops letting in more water 7 Switch on the other master switch observe that The liquid line valve opens The gearmotor runs Within a short t...

Страница 8: ...is 4 80 F Measure the temperature of the evaporator outlet at the TXV bulb and check the low side pressure at the EPR valve Convert the pressure to temperature using a temperature pressure chart and s...

Страница 9: ...The relays are for the gear motor with a built in time delay to clear the evaporator of ice when the unit turns off and for the liquid line valve Transformer Supplies low voltage to the circuit board...

Страница 10: ...ion being where the two seal faces meet Ice Sweep A plastic cap with fingers It revolves with the auger to sweep the ice into the ice chute Divider Where the ice is compressed and much of the extra wa...

Страница 11: ...light will stay on and the machine will continue to run unless the ice stays between the sensors for more than 15 seconds bin full At that point the bin empty light goes out and the machine shuts down...

Страница 12: ...ich it enters through the float valve The water then goes out the bottom of the reservoir tank to the bottom of the evaporator Reservoir overflow or evaporator condensation is routed to the drain WATE...

Страница 13: ...e thermostatic expansion valve meters the liquid refrigerant into the evaporator where it boils off evaporates and absorbs heat It then moves through the ball valve and into the evaporator pressure re...

Страница 14: ...n has been added to the reservoir and the reservoir is nearly empty switch the master switch to OFF 11 After draining the reservoir as in step 6 wash and rinse the water reservoir 12 Go thru steps 13...

Страница 15: ...lso be checked at least two times per year Check the bearing by pushing the bail clamp back and removing the ice chute cover unscrewing the ice sweep unscrewing the breaker cover unscrewing the auger...

Страница 16: ...rmation on removal of these parts see REMOVAL AND REPLACEMENT 1 To remove the auger remove front and top panel If top panel cannot be removed or if there is less than 6 clearance over the top of the m...

Страница 17: ...ORMATION 3 If the transformer is fine and the no water light is ON check the water level sensor a Check the water level in the reservoir restore if low If the water level is ok b Remove the water leve...

Страница 18: ...rvoir from ice maker 8 Reverse to reassemble BIN CONTROLS Ice Level Sensors 1 Disconnect electrical power 2 Remove front panel 3 Remove control box cover 4 Locate ice chute at the base of the chute in...

Страница 19: ...ugh spots and damage a The bearing is pressed into the breaker to remove the bearing and replace it an arbor press is needed b Replace lower seals before installing new bearing in breaker Note seals m...

Страница 20: ...breaker to evaporator d Lift up and remove breaker from evaporator e If the auger is stuck use a slide hammer type puller to pull on the auger at the threaded hole The size of that hole is 5 8 18 Insp...

Страница 21: ...of the water seal that rotates with the auger must also be replaced Remove the old part from the auger and clean the mounting area 4 Place a small bead of food grade silastic sealant such as 732 RTV...

Страница 22: ...sweat in the new evaporator at the old connections 6 Install an new drier in the liquid line 7 Evacuate the system until dehydrated then weigh in the nameplate charge Check for leaks 8 Install auger b...

Страница 23: ...kly check the gears and bearings They are likely to be fine if the oil is If there is evidence of water in the oil rusty bearings and gears the oil having a creamy white appearance oil level too high...

Страница 24: ...ve the bin full switch on the tester to Full The light on the tester should be ON If the light on the tester is not on the circuit board should be replaced b If the light on the tester IS on move the...

Отзывы: