![SCIEX NanoSpray Скачать руководство пользователя страница 59](http://html1.mh-extra.com/html/sciex/nanospray/nanospray_operators-manual_1217533059.webp)
2. Attach the monitor to the bracket with the thumbscrew. Refer to
.
Figure 6-8 Bracket Assembly for Right- and Left-Side Installation
Description
Item
Bracket orientation for left-side installation (not applicable for TripleTOF
®
systems)
1
Bracket orientation for right-side installation
2
Installation holes
3
Thumbscrews
4
3. Connect the monitor cables. Refer to
.
Install the Monitor on 3200 and 4000 Series Systems
The monitor stands on an adjustable shelf.
1. Install the monitor on the shelf. The monitor is not fastened to the shelf, so that the user can determine the
best viewing position.
Note:
Make sure that the monitor is secured on the stand.
2. Connect the monitor cables. Refer to
.
NanoSpray
®
Ion Source
Operator Guide
59 / 92
RUO-IDV-05-0811-F
Ion Source Maintenance