13-16
Testing and Troubleshooting
Date Code 20011205
SEL-311B Instruction Manual
Figure 13.6: Phase-to-Phase Fault Test Connections Using a Single Current Source
Serial Communication Equipment Connections
A terminal or PC with communications software is necessary to make SEL
OGIC
control equations
setting changes and examine relay event reports. We recommend using a terminal during relay
testing. Figure 13.7 shows typical connections between a computer and the SEL-311B Relay
Port F. Complete details regarding serial communications with the relay may be found in
Section 10: Serial Port Communications and Commands
.
WARNING
!
Use only serial communications cables manufactured by SEL or built
to SEL specifications with the SEL-311B Relay. Damage to the relay
or your communication equipment may result from the use of incorrect
communication connections.
Содержание SEL-311B
Страница 6: ......
Страница 8: ......
Страница 10: ......
Страница 24: ......
Страница 26: ......
Страница 122: ......
Страница 124: ......
Страница 138: ......
Страница 168: ......
Страница 172: ......
Страница 254: ......
Страница 282: ......
Страница 306: ......
Страница 348: ......
Страница 364: ......
Страница 366: ......
Страница 448: ......
Страница 460: ......
Страница 466: ......
Страница 476: ......
Страница 482: ......
Страница 494: ......
Страница 500: ......
Страница 522: ......
Страница 526: ......
Страница 528: ......
Страница 534: ......
Страница 536: ......
Страница 550: ......
Страница 570: ......
Страница 586: ......
Страница 600: ......