Remote Control Manual
IM060930
RD: SEPT 2006
RL: 03A
KH
10
Read the Programming / Setup section (pages 4 & 5) prior to installing the receiver into a heater.
Complete the “Patio Floor Plan sketch and Settings Table” on the last page of this manual to assist
you in the installation & programming process
.
Refer to the wiring diagram
(following these pages)
in this manual for electrical connection of the 24V Relay
and receiver to the heater ignition system.
NOTE: We recommend the installation of an External Manual Over-ride Switch to allow temporary operation of
the heater(s) if the Hand Set Transmitter is misplaced or malfunctions.
(Refer to Wiring Diagram)
The Manual Over-ride Switch must be in the ‘Off” position for the remote control system to operate.
FIGURE 1
1. Remove burner side panel (electrical cord side) by
removing all fastening screws
2. Remove 2 screws in the end of the housing that
secure the component plate inside the housing
NOTE: Retain all screws for reattachment of
component plate & side panel
FIGURE 2
3. Slide component plate out of
burner housing
FIGURE 3
4. Install the 120V/24V Relay Switch on to the
component plate; align to the predrilled holes
in the plate and fasten with bolts/nuts provided.
5. Connect wiring as indicated in the Wiring Dia-
gram (page 11).
RECEIVER KIT INSTALLATION - JP-1234-TK
SPW / IWP Tube Heater Series
(Model STW / IW is shown below—follow the same instructions for SPW / IWP)