Assembly
01.00|KSP3-IM, KSP3-LH-IM |en
27
Supply lines
The clamping force block has four air connections:
I, II, III, IV
.
Two connections for OPEN (
I
and
III
) and two connections for
CLOSE (
II
and
IV
).
The application determines which of the two air connections must
be opened for actuation:
• Connections
I
and
II
for operation without a base plate
• Connections
III
and
IV
in the base for hose-free, direct
connection to the machine table or on the base plate.
The threads for hose-free, direct connection are not designed for
pneumatic fittings.
Thread for pneumatic fitting (front):
KSP3 and KSP3-LH 100
M5
KSP3 and KSP3-LH 140-, 160 and 250
G1/8"
NOTE
• The clamping force block is delivered with all four air
connections sealed. On the base side with set-screws (item 60)
and on the front with locking screws (item 23).
• When using the air purge via connection 5, the two sound
absorbers (
V
) must be removed and replaced by set-screws
• Requirements for compressed air supply: Compressed air,
compressed air quality according to ISO 8573-1: 7:4:4
Unconditioned compressed air contains moisture as well as
dust and oil particles, all of which can lead to malfunctions or
premature wear in the clamping force block. The oiler should
be no more than 2 meters from the coupling point.
• The clamping force block has two more base connections (
6/7
)
for direct lubrication through the machine table. These
connections come sealed on delivery with set-screws (item 62).
5.3.1