background image

10 

 

4. Balance adjustment for this fan. "Invisible system" 

Although the fans are balanced before shipping, balance can be affected by transit. As a consequence, re-balance the fan by 
following these steps if you find that the fan has a noticeable wobble once fully assembled. 

1º- Remove the balance kit from the packaging and place two of the balance magnets on any of the marked spaces, as shown in 
Figure A.  Then turn the fan on to see if it continues to wobble. Repeat this until you find the position that corrects the wobble and 
allows the fan to run smoothly. 

2º- Remove the balance magnets and attach the balance kit in order to stick them in place. Figure B 

        

        

 

TROUBLESHOOTING: 

1.  The fan won´t start. 

-Check the fan wiring; ensure all the cables are connected correctly. 

-Check and ensure that the input power is correct at 220V / 50HZ. 

2. The fan makes a loud noise 

- Ensure all the screws have been tightened correctly. 

- Ensure the wire nut connections are not rubbing against each other or against the inside of the canopy box. 

 

REMOTE CONTROL 

 

FROM THE WALL SWITCH YOU CAN ALSO USE THE LIGHTING FUNCTIONS OF THE "LIGHT ON / OFF" BUTTON. 

Содержание 168342

Страница 1: ...arente Función temporizador Mando a distancia NOTA SCHULLER RECOMIENDA LA COLOCACIÓN DE PROTECTORES DE SOBRETENSIÓN PARA EVITAR LOS DAÑOS EN LOS COMPONENTES ELECTRÓNICOS DE LA LUMINARIA LED Disponibles en nuestro catálogo Para cualquier duda técnica póngase en contacto con nuestro Departamento Técnico Estamos a su servicio en nuestro email irodriguez schuller es o en nuestro teléfono 961 601 051 E...

Страница 2: ... onentes aje ntes del Canop ector del cuerpo ador ación LED alación incluido emoto l soporte de m os en el techo a techo de obr priételo con las ventilador debe realizada por un s no toque la cu DE INSTALAC í 2A Corto y 2 o de ventilador o imanes y torni montaje o con una prof ra o 4 balanci s tuercas hast 1 SOPOR e ser de 220 V n profesional cu uchilla cuando e CIÓN 2B largo llos undidad adec ine...

Страница 3: ... drive ED centrado ar la altura des onado si no es el tubo y en el aro de unión s de él previam del aro hasta o Cubra el ar oporte de mon n el aro de circ r mediante los en la cara inf seada del ven stá ya pre inst orden indicad situado en la mente Gírelo inmovilizar el ro de unión co ntaje y gire el cuito LED intro s tornillos inclu ferior del cuerp ntilador talada Usand do en el esque parte supe...

Страница 4: ... que salen del ventilador por la parte superior Después conecte el cable de red con los cables INPUT del Módulo Una vez conectados todos introduzca el módulo en el espacio reservado en el soporte de montaje del techo 8º Levante el canopí hasta el techo para cubrir el soporte de montaje asegúrese que el canopí se asiente en los dos tornillos del soporte gire el canopí para asegurarse que la cabeza ...

Страница 5: ...l problema de oscilación aún se nota Repita esto hasta encontrar el lugar que permitirá que desaparezca el problema de la oscilación 2º Quite las piezas del imán de equilibrio y coloque la tira adhesiva en su posición Figura B SOLUCIÓN DE PROBLEMAS Si el ventilador no arranca Compruebe las conexiones de los cables al ventilador asegúrese de que estén todas correctas Compruebe y asegúrese de que la...

Страница 6: ...table blades in clear acrylic Timer function Remote control NOTE SCHULLER RECOMMENDS TO PLACE SURGE PROTECTORS TO AVOID DAMAGES TO THE ELECTRONIC COMPONENTS OF THE LED LUMINAIRE Available in our catalogue If you have any technical questions please do not hesitate to contact our technical Department We are at your disposal in our emai irodriguez schuller es Rev 10 21 ...

Страница 7: ...a power i allation should b injury do not to AND INSTALL nents acket s 2A short y e ylic diffuser stallation tools the ceiling m deep holes int ng mount brac nput of 220 V be carried out b uch the blades LATION STEP 2B long including magn mount bracke to the ceiling cket onto the e 1 CEIL 50 HZ by a qualified ele while the fan is PS nets and screws et using a 8mm expansion bolt LING MOUNT B ectric...

Страница 8: ... the semi sp ed onto the LE r using the sc o use accordin he pin and set er onto the tub om the connec rough the tube be is firmly fix with the conne phere on the m ED board by in rews provided ng to the desir screw to inse be in the orde ctor ring place e Rotate until xed in place ti ctor cover mounting brac nserting their p d red height of th ert the hemisp r indicated in ed in the uppe the hole...

Страница 9: ...the ideal placement 7º Next to the ceiling bracket connect the module to the wires that come out from the top downrod topside Then connect the network cable to the INPUT cables of the module Once all are connected insert the module into the reserved space on the ceiling mount 8º Raise the canopy to the ceiling to cover the ceiling mount ensuring the canopy rests on the two bracket screws rotate th...

Страница 10: ...epeat this until you find the position that corrects the wobble and allows the fan to run smoothly 2º Remove the balance magnets and attach the balance kit in order to stick them in place Figure B TROUBLESHOOTING 1 The fan won t start Check the fan wiring ensure all the cables are connected correctly Check and ensure that the input power is correct at 220V 50HZ 2 The fan makes a loud noise Ensure ...

Отзывы: