VARISTAR LHX 20
Commissioning
Cooling module 60714-050
www.schroff.biz
11
R2.1, May 10, 2012
5 Commissioning
5.1 Setting up the VARISTAR cabinet
5.2 Initial Commissioning
Before commissioning the cooling module the following work
must
be carried
out:
• Connect to cooling water source.
• Connect to supply voltage.
• Bleed (exhaust any trapped air from) the cooling module.
Danger of tipping over!
The asymmetrical positioning of the cooling module poses a risk of the cabinet
tipping over. The VARISTAR LHX 20 must always be adequately secured
during transport.
Attention!
The setting up, commissioning, completion, maintenance and repair of
VARISTAR cabinets may only be carried out by suitably trained technical
personnel.
During all such operations the nationally applicable health and safety
regulations must be adhered to.
ServicePLUS
The setting up, commissioning, completion, maintenance and repair of
VARISTAR cabinets may also be carried out within Schroff's service program.
Please ask about our after-sales services.
You can obtain further information about our ServicePLUS options online at:
www.schroff.biz/ServicePlus
Hazardous voltage!
Under certain circumstances during commissioning, completion, maintenance
and service it is necessary to open the enclosure.
Some exposed parts may be under live voltage. These works must therefore
only be carried out by specially trained technical personnel.