NSTALLATION

 

R

ACK VERSION

 

The sequence of operations required to convert the BATTERY BOX into the rack version is 
described below. 

WARNING: for your safety and that of your product, follow the information set out below 
exactly. 

 

BEFORE CARRYING OUT THE FOLLOWING SEQUENCE OF OPERATIONS, ENSURE 

THAT THE BATTERY BOX IS NOT CONNECTED TO THE ELECTRICITY MAINS, TO 

THE UPS OR TO ANY OTHER BATTERY BOXES

 

 

 

1 -

 

First remove the 4 feet at the base of the 
BATTERY  BOX.  Put  the  BATTERY 
BOX  into  a  horizontal  position  taking 
the utmost care and with a small slotted 
screwdriver  carefully  lift  the  pin  at  the 
centre  of  the  foot.  Once  it  has  been 
lifted,  remove  the  foot  from  the  base. 
Repeat  the  same  operations  for  the 
remaining  feet.  The  exact  sequence  to 
follow is shown at the side: 

 

 

 

 

2 -

 

Once  all  the  feet  have  been  removed,  the  mask  must  then  be 
rotated. Insert the keys provided in the release slots located at the 
sides of the mask and exert enough gentle pressure to release it from the BATTERY 
BOX, as shown in the figure at the side. 

 

 

 

 

3 -

 

(only for the version with battery charger)

: The mask is connected to the BATTERY 

BOX by a specific cable. The mask must therefore be removed with the  utmost care 
and avoiding violent pulls or other sharp movements so as to avoid any damage to the 
LED  panel  and/or  to  the  actual  BATTERY  BOX.  DO  NOT  UNDER  ANY 
CIRCUMSTANCES  TRY  TO  SEPARATE  THE  MASK  FROM  THE  BATTERY 
BOX. 

4 -

 

Rotate  the  mask  90°  anticlockwise,  carefully  insert  in  the  housing  and  exert  gentle 
pressure near the release slots until a slight click is heard with the mask remaining in 
position. 

1

2

Содержание GENIO Dual Maxi Series

Страница 1: ...USER MANUAL UNINTERRUPTIBLE POWER SUPPLY Series GENIO Dual Maxi Battery boxes USBB240A3 USBB240A5 USBC240A5...

Страница 2: ...tructions for the use and installation of the BATTERY BOX for UPSs To get the most out of this device please read these instructions and follow them carefully Keep this manual near the BATTERY BOX No...

Страница 3: ...ESCRIPTION OF OPERATION 6 INSTALLATION 7 OPENING THE PACKAGING AND CHECKING ITS CONTENTS 7 TOWER VERSION 8 RACK VERSION 9 INSTALLATION PROCEDURE 11 CONNECTING THE BATTERY BOX 11 MULTIPLE EXPANSIONS 12...

Страница 4: ...to requirements by using the handles kit The two different versions of the product are shown below JSDL240PA3 JSDL240PA5 JSDL240CA5 Nominal capacity Ah 7 9 9 Dimensions H x L x P mm 455 x 175 x 660 1...

Страница 5: ...TERY BOX Release slots Extractable rotatable mask Removable front panel Front view Ventilation grid IEC 10A input only in versions with battery charger Fuse holder disconnecting switches Connectors fo...

Страница 6: ...n the type of UPS the BATTERY BOX is intended for The utmost care must therefore be taken to ensure that the battery voltage of the BATTERY BOX is the same as the voltage allowed by the UPS The BATTER...

Страница 7: ...check the contents The packaging should contain the following BATTERY BOX Power cable only for models with battery charger Battery expansion cable Handles kit for rack version 3 plastic covers upper...

Страница 8: ...NOT CONNECTED TO THE ELECTRICITY MAINS TO THE UPS OR TO ANY OTHER BATTERY BOXES Once removed from the packaging the BATTERY BOX is ready for installation in tower configuration All that is needed to c...

Страница 9: ...erations for the remaining feet The exact sequence to follow is shown at the side 2 Once all the feet have been removed the mask must then be rotated Insert the keys provided in the release slots loca...

Страница 10: ...with the screws as shown in the figure at the side NOTE The BATTERY BOX is compatible for mounting in standard rack cabinets of 600mm x 800mm or more in width Support brackets guides with L shaped sup...

Страница 11: ...ive humidity must not exceed 90 Avoid dusty environments Take care to position the BATTERY BOX with the front and the back at least 10 cm from walls and ensure that objects are not placed on the air s...

Страница 12: ...PACITY SETTINGS SOFTWARE CONFIGURATION When one or several BATTERY BOXES have been installed the UPS must be configured to update the nominal capacity value total Ah of batteries within the UPS extern...

Страница 13: ...y No mains voltage black out Check that voltage is present in the plug used to connect the BATTERY BOX by trying it with a table lamp for example Battery charger input fuse has blown Call SERVICE to r...

Страница 14: ...oltage Dimensions H x L x W mm 455 x 175 x 660 5 Weight Kg 67 BASIC MODELS JSDL240PA3 JSDL240PA5 BATTERY Nominal voltage Vdc 240 Nominal Ah Ah 7 9 End of charge voltage Vdc 273 No of batteries V Ah 20...

Страница 15: ...page 15...

Страница 16: ...MAN_USBB240A3 USBC240xx_EN_2011_03 doc 0MNSDL240NP5LUA...

Отзывы: