schmersal SLC 210 Скачать руководство пользователя страница 18

 

SLC 210 / SLG 210 

 

 18 

TECHNICAL SPECIFICATIONS 

TECHNICAL SPECIFICATIONS OF SLC 210 / SLG 210 BARRIERS 

Protected height 

mm 

160 – 1810 

Resolutions  

mm 

20 –40– 90 

standard 

0 – 6 

Working range    m 

extension -H 

1 - 16 

Safety outputs 

 

2 PNP – 500mA @24V

DC

 

Response time 

msec 

 (see tables) 

Internal test 
execution time 

msec 

500 

Power supply 

V

DC

 

24 

±

 20% 

Connections  

 

M12 connector,  5-pole 

Max. conn. length 

100 

Operating temp.  

°C 

0 - 55 °C 

Protection rating 

 

IP 65 

Dimensions of section 

mm 

35 x 45 

Max. consumption 

2 (Emitter) 

3 (Receiver) 

 

 

 

SLC 210-E/Rxxxx-20-12(-H) 
Resolution 20 mm 

0160  0310  0460  0610  0760  0910  1060  1210  1360  1510  1660  1810 

Number of beams 

15 

30 

45 

60 

75 

90 

105 

120 

135 

150 

165 

180 

Response time              msec 

8,5 

10,5  12,5  14,5  16,5 

18 

20 

22 

24 

26 

28 

Overall barrier height     mm 

261 

411 

561 

711 

861  1011  1161  1311  1461  1611  1761  1911 

 

 

SLC 210 E/Rxxxx-40-12(-H) 
Resolution 40 mm 

0310  0460 

0610  0760  0910  1060  1210  1360  1510  1660 

1810 

Number of beams 

10 

15 

20 

25 

30 

35 

40 

45 

50 

55 

60 

Response time             msec 

7,5 

8,5 

9,5 

10 

10,5 

11 

12 

12,5 

Overall barrier height   mm 

411 

561 

711 

861  1011  1161  1311  1461  1611  1761 

1911 

 

 

SLC 210-E/Rxxxx-90-12(-H) 
Resolution 90 mm 

0460  0610  0760  0910  1060  1210  1360  1510  1660  1810 

Number of beams 

11 

13 

15 

17 

19 

21 

23 

25 

Response time 

6,5 

7,5 

Overall barrier height             mm 

561 

711 

861 

1011  1161  1311  1461  1611  1761  1911 

 

 

SLG 210-E/Rxxxx-xx-12(-H) 
Multibeam Models

 

0500-02 

0800-03 

0900-04 

Number of beams 

Distance between beams 

mm 

500 

400 

300 

Response time 

msec 

Overall barrier height 

mm 

711 

1011 

1111 

Содержание SLC 210

Страница 1: ...CAL POSITION OF THE BARRIER 7 HORIZONTAL POSITION OF THE BARRIER 8 ELECTRICAL CONNECTIONS 9 MULTIPLE SYSTEMS 12 DISTANCE BETWEEN REFLECTING SURFACES 12 USE OF DEFLECTION MIRRORS 14 MECHANICAL ASSEMBLY...

Страница 2: ...y PLC or to another control system that satisfies the specific requirements and safety level of the application SLC 210 SLG 210 is ideal for protecting Machinery for product handling such as conveyors...

Страница 3: ...the centres of two adjacent lenses The height of the protected area is the height that is actually protected by the safety barrier If the latter is placed horizontally this value refers to the depth...

Страница 4: ...than or equal to the resolution of the specific model The general instructions set out below must be taken into consideration before placing the safety device in position Make sure that the temperatur...

Страница 5: ...precautions must be taken in order to prevent the formation of condensation on the lenses which could have an adverse effect on monitoring POSITIONING The position of the Emitter and the Receiver must...

Страница 6: ...in seconds sec t2 response time of the safety interface in seconds e g PLC or safety module sec t3 machine response time in seconds meaning the time required for the machine to interrupt the dangerou...

Страница 7: ...e accessed from above the highest beam of the barrier must be at a height H of at least 1800 mm from the base G of the machine S 150 mm Figure 4 90 mm resolution models These models are suitable for t...

Страница 8: ...NTAL POSITION OF THE BARRIER When the object s direction of approach is parallel to the floor of the protected area the barrier must be installed so that the distance between the outer limit of the da...

Страница 9: ...tage complies with the one specified in the technical data sheet Emitter and Receiver units must be supplied with PELV type 24 VDC 20 power supply e g by means of an insulating transformer according t...

Страница 10: ...C Power supply negative 4 N C N C 5 PE Ground connection Table 1 If the TEST function is not required by the application connect pin 2 of the emitter to 24 VDC RECEIVER NUMBER NAME MEANING 1 24 VDC Po...

Страница 11: ...nstructions for connection cables For connections over 50 m long use cables with a cross section area of 1 mm 2 Connect the Emitter and the Receiver to the ground outlet The connection cables must fol...

Страница 12: ...EN REFLECTING SURFACES The presence of reflecting surfaces in proximity of the photoelectric barrier may generate spurious reflections that prevent monitoring With reference to Figure 12 object A is n...

Страница 13: ...imum distance d that must be maintained when the distance l between the Emitter and Receiver is changed Figure 12 After installing the system check whether any reflecting surfaces intercept the beams...

Страница 14: ...plication in which two deviation mirrors are used to provide a U shaped protection Figure 13 The following rules should be taken into consideration when using deviation mirrors Place the mirrors so as...

Страница 15: ...me axis as that of the corresponding beams on the Receiver Move the Emitter in order to find the area within which the green LED on the Receiver stays on then position the first beam of the Emitter th...

Страница 16: ...gaged 4 Yellow On Weak signal received 4 Yellow Blinking Detection of hazardous interfering emitter condition 6 Red On Overcurrent on one or both outputs OSSD 6 Red Blinking Erroneous connection of se...

Страница 17: ...ally entering the protected area By means of the test function which simulates occupation of the protected area it is possible to verify the operation of the entire system by means of an external supe...

Страница 18: ...sponse time msec 7 8 5 10 5 12 5 14 5 16 5 18 20 22 24 26 28 Overall barrier height mm 261 411 561 711 861 1011 1161 1311 1461 1611 1761 1911 SLC 210 E Rxxxx 40 12 H Resolution 40 mm 0310 0460 0610 07...

Страница 19: ...0 A 251 401 551 701 851 1001 1151 1301 1451 1601 1751 1901 B PROTECTED AREA 160 310 460 610 760 910 1060 1210 1360 1510 1663 1810 C 85 Mounting 2 mounting kits 3 mounting kits Figure 18 Mounting kit i...

Страница 20: ...astening brackets for deviation mirrors Figure 20 Deviation mirrors inserts M8 Type H SMB 250 250 SMB 370 370 SMB 540 540 SMB 715 715 SMB 885 885 SMB 1060 1060 SMB 1230 1230 SMB 1400 1400 SMB 1575 157...

Страница 21: ...er of the detection zone and then close to the emitter and the receiver Make sure that during each stage of the test object s movements the red LED on the Receiver is permanently on Figure 21 The SLC...

Страница 22: ...e two outputs 6 Red Blinking Erroneous connection of semiconductor outputs OSSD 4 Yellow 6 Red Blinking Internal failure detected In any case when faced with a system stoppage switch the system off an...

Страница 23: ...SCR 1R SCR 1R Safety Relay 1666600420 KD M12 5 5m S Straight 5 pin M12 female connector 5 m cable 1666655360 KD M12 5 15m S Straight 5 pin M12 female connector 15 m cable 1666655380 SLC TR 14 14 mm di...

Отзывы: