Bin Trailer
T. G. Schmeiser Co., Inc.
Ph. (559) 268-8128
Fax (559) 268-3279
19
MAINTENANCE SCHEDULE
Hours and
Serviced By
Before Each Use or Daily
Ensure that all fasteners are tight, and all pins are secured
in place.
Inspect the frame for structural fractures.
Make sure all warning decals are in place and legible.
Check tires for proper pressure. Adjust if necessary.
Check all rollers for wear and damage. Replace if
necessary.
Every 50 Hours or Weekly
Perform the Daily Maintenance schedule.
Lubricate zerk fittings on pull frame hinges with a
good general purpose grease.
Every 1000 Hours or Annually
Perform the Daily Maintenance schedule.
Perform the Weekly Maintenance schedule.
Lubricate zerk fittings on pull frame hinges with a
good general purpose grease.
Remove debris and clean the entire implement with
compressed air or a pressure washer.
Remove rust and apply a coat of paint to frame surfaces
where the paint has been worn off or damaged.
Maintenance
Содержание HBT2N
Страница 2: ...Copyright 2019 T G Schmeiser Co Inc All rights reserved...
Страница 28: ...Version 1 1 June 2019...