TOOLS NEEDED 

 

13 mm socket to suit flanged hex head of M8 fasteners 

 

FURTHER REQUIRED DOCUMENTATION 

 

Product range doesn’t include roof hooks

 

 

 

TIGHTENING TORQUE 

 

Screw connections M8: 15 Nm  

 

Exception: Wood screws: with depth stop 

 

SAFETY INSTRUCTIONS  

Planning, installation and commissioning of the solar power system must only be performed by 

qualified technical personnel. Improper execution can result in damage to the system and 

premises and endanger persons.  

Falling hazard! Working on the roof as well as ascending and descending poses a risk of falling. 

It is vital to observe accident prevention regulations and use appropriate fall protection 

equipment.  

Injury hazard! Falling objects pose a risk of injury to people. Prior to installation, set up 

barriers in the hazard area to warn people nearby. 

 

 

 

 

Содержание SECT

Страница 1: ...SECT INSTALLATION MANUAL SECT patent pending in flush north or east west variants...

Страница 2: ...ptions 4 1 4 No reach installation 5 1 5 Types of roof fixings 5 2 LAYOUT AND ASSEMBLY 6 2 1 Fixing spacing 6 2 2 Length of column or row 6 2 3 Assembly 7 2 4 Joining channels 9 2 5 Earthing 9 3 INSTA...

Страница 3: ...anning installation and commissioning of the solar power system must only be performed by qualified technical personnel Improper execution can result in damage to the system and premises and endanger...

Страница 4: ...the same orientation also called north 0 tilt also called flush 1 2 Compliance and certification SECT is supplied with a generic certification that suits most buildings covering wind regions A B C ter...

Страница 5: ...e Assembly occurs by sliding the far edge of the module into the C shaped profile then clamping at the near edge This way installers don t have to reach a meter over the module to tighten a fastener 1...

Страница 6: ...to the roof sheet rib spacing However the purlin spacing needs to match the approved clamping zones defined by the module installation manual e g from 1000 to 1600 mm to fit the typical 10 25 clamping...

Страница 7: ...cers 3 Position the first module then fix the module to the channel using two edge brackets 4 Slide the far edge of the first module into the C sections offered by the edge brackets then position two...

Страница 8: ...ar using the same brackets Note that the edge brackets are always oriented so that the stainless steel clamp plate faces the module Assembly of SECT flush is even simpler using the SPFB 40 flush brack...

Страница 9: ...ainless steel module clamp plates Each module is held using two clamps plates Each clamp plate has two sharp edges that penetrate the aluminium oxide layer on the frame of the solar module Thus if the...

Страница 10: ...mps should be installed directly on top of the purlin i e on top of the concealed clip which holds the roof sheet to the purlin Channel should be extended past the last module frame to overlap the nex...

Страница 11: ...e with all common roofing materials including galvanized iron Zincalume and Colorbond Therefore the aluminium channel foot is permitted to directly contact the roof sheet However SECT recommends the u...

Страница 12: ...hole in the base to suit a M8 anchor 6 CABLE TRAYS 6 1 Cable trays on a sheet metal roof SECT channel and channel lid and channel feet can be used as an alternative to galvanized steel cable tray Chan...

Страница 13: ...tray Fasteners are Masonry Torx Screw 7 5 mm diameter x 40 mm length part 1CCT1C407 5040 into a pre drilled 6 mm diameter hole 6 3 Cable trays on another channel Channel as cable tray can be fixed on...

Страница 14: ...lectrical installation including DC cabling DC isolators inverter and AC cabling is conducted using standard solar PV installation methods and procedures The SECT frame is fabricated from mill finish...

Страница 15: ...0 0 SCHLETTER SOLAR GMBH Alustrasse 1 83527 Kirchdorf GERMANY www schletter group com We reserve the right to changes including technical modification...

Отзывы: