Schletter FixZ-15 Скачать руководство пользователя страница 6

EN

2

© Schletter GmbH 

 Gewerbegebiet an der B15 

 Alustraße 1 

 83527 Kirchdorf/Haag i. OB 

 Germany 

 Tel.: +49 8072 9191-200

Fax: +49 8072 9191-9200 

 E-mail: [email protected] 

 www.schletter.eu 

 Updated 01/2015 

 Subject to change without notice

Your  contact  in  the  UK:  Schletter  UK  Limited,  Tel.:  +44  1296  461  800,  Fax:  +44  1296  461  801,  E-mail:  [email protected]

FixZ-15 Mounting Instructions

n

 

Defining the area of installation

• 

Concentrate the number of fasteners 
in the edge and corner zones.

• 

Further recommendations are pro- 
vided in the structural analysis.

Calculation formula: 
e = min (x resp. y or 2 

.

 h)

Corner zone

Edge zone

Corner zone

 
 
 
 

Roof center zone

 
 

Edge zone

 
 

Edge zone

Corner zone

Edge zone

Corner zone

x

y

e/4

e/4

e/10

e/10

e/10

e/10

e/4

e/4

h

a

b

b

a

o

 

Mounting the fasteners

• 

Select corresponding distance be-
tween fasteners 

a

 for the respective 

module. The exact dimensions are 
displayed in the Autokalkulator 
schematic diagram of your plant 
configuration.

• 

Please observe shading distances 

b

 between rows - also visible in the 

schematic diagram.

• 

The distance between fasteners 

c

 

must comply with the structural 
analysis for fasteners - and is also 
displayed in the schematic diagram.

• 

Further recommendations are pro-
vided in the structural analysis (for 
fasteners). 
 
 

The number of fasteners required is  
also dependent upon the properties 
of the roof - please  verify details with 
the manufacturer!

c

Building

c  bottom

c  top

Содержание FixZ-15

Страница 1: ...when working on the roof as well as when ascending and descending the building Accident prevention regulations must be observed and appropriate safety equipment must be used Risk of injury Objects fal...

Страница 2: ...4 e 10 e 10 e 10 e 10 e 4 e 4 h a b b a o Mount fasteners t Select corresponding distance be tween fasteners a for the respective module The exact dimensions are displayed for you in the Autokalkula t...

Страница 3: ...UK Schletter UK Limited Tel 44 1296 461 800 Fax 44 1296 461 801 E mail info schletter co uk FixZ 7 Mounting Instructions p Mount system rail t Mount system rail on the fasteners in our example Hook i...

Страница 4: ...systems please visit our website www schletter eu under Downloads in the Solar section r Module mounting t Position the first module flush with the end of the rail then observe the inden tation distan...

Страница 5: ...when ascending and descending the building Accident prevention regulations must be observed and appropriate safety equipment must be used Risk of injury Objects falling from the roof can cause injury...

Страница 6: ...one Corner zone Roof center zone Edge zone Edge zone Corner zone Edge zone Corner zone x y e 4 e 4 e 10 e 10 e 10 e 10 e 4 e 4 h a b b a o Mounting the fasteners Select corresponding distance be tween...

Страница 7: ...example Hook in to the KlickTop attachment and secure with a 6 Lobe screw T40 q Extending the lower system rail Position next rail Mount the E connector from below Tighten the pre assembled 6 spanner...

Страница 8: ...s please visit our website www schletter eu under Downloads in the Solar Mounting section a s Mounting the module Position the first module flush with the end of the rail then observe the indentation...

Страница 9: ...as when ascending and descending the building Accident prevention regulations must be observed and appropriate safety equipment must be in place Risk of injury Objects falling from the roof can cause...

Страница 10: ...kalkulator t Further recommendations are offered in the structural analysis for fasteners The number of fasteners required is also dependent upon the properties of the roof please verify details with...

Страница 11: ...act in the UK Schletter UK Limited Tel 44 1296 461 800 Fax 44 1296 461 801 E mail info schletter co uk p Mount module bearing profile t Feed square head screws M10x25 into the lower bearing profile an...

Страница 12: ...schletter eu under Downloads in the Solar section r Position bearing plate t Place bearing plate in required fastening position s Module mounting t Position first module to the end of profile t Secur...

Страница 13: ...lified specialists Poor quality execution can result in damage to the plant and to the building and can present a risk to people Risk of falling There is a risk of falling when working on the roof as...

Страница 14: ...okalkulator t Further recommendations are offered in the structural analysis for fasteners The number of fasteners required is also dependent upon the properties of the roof please verify details with...

Страница 15: ...tact in the UK Schletter UK Limited Tel 44 1296 461 800 Fax 44 1296 461 801 E mail info schletter co uk p Mount module bearing profile t Feed square head screws M10x25 into the lower bearing profile a...

Страница 16: ...are nuts t Feed KlickIn click components into the groove at the required positions t Feed square nuts into the click com ponents and twist through 90 so that the rounded edge is underneath s Position...

Страница 17: ...Your contact in the UK Schletter UK Limited Tel 44 1296 461 800 Fax 44 1296 461 801 E mail info schletter co uk v Module mounting t Guide modules into the clamps For further information relating to o...

Отзывы: