Schletter CompactDirect Скачать руководство пользователя страница 2

EN

2

© Schletter GmbH 

 Gewerbegebiet an der B15 

 Alustraße 1 

 83527 Kirchdorf/Haag i. OB 

 Germany 

 Tel.: +49 8072 9191-200

Fax: +49 8072 9191-9200 

 E-mail: [email protected] 

 www.schletter.eu 

 Updated 11/2012 

 Subject to change without notice

Your contact in the UK: Schletter UK Limited, Tel.: +44 1296 461 800, Fax: +44 1296 461 801, E-mail: [email protected]

CompactDirect Mounting Instruction

 

Mount fasteners

• 

Information relating to mounting of 
fasteners can be taken from the type-
specific or from the generic mounting 
instructions. Mounting and Project 
Planning

 

Define the area of installation

• 

Concentrate the number of fasteners  
in edge and corner zones.

• 

Please observe further recommenda-
tions from the structural analysis.

Calculation formula: 

e = min (x / y or 2 

.

 h)

x

y

e/4

e/4

e/10

e/10

e/10

e/10

e/4

e/4

h

Building

 

Position fasteners

• 

Note measurement 

A

.

• 

 Please observe the shading distances 

B

 between module rows. These can be 

taken from the calculation docu-
mentation (or, for example, from our 
shade calculator, available on our 
website.

A

A

B

Corner zone

Edge zone

Corner zone

 
 
 
 

Field zone

 
 

Edge zone

 
 

Edge zone

Corner zone

Edge zone

Corner zone

Содержание CompactDirect

Страница 1: ...used Risk of injury Objects falling from the roof can cause injury to people The danger area around the installation site must be sealed off and people close to this area must be warned Risk of breakage Never step on PV modules these can be damaged under the weight Risk of electric shock The mounting and maintenance of the PV modules must be carried out by qualified personnel only Please observe t...

Страница 2: ...type specific or from the generic mounting instructions Mounting and Project Planning Define the area of installation Concentrate the number of fasteners in edge and corner zones Please observe further recommenda tions from the structural analysis Calculation formula e min x y or 2 h x y e 4 e 4 e 10 e 10 e 10 e 10 e 4 e 4 h Building Position fasteners Note measurement A Please observe the shading...

Страница 3: ... E mail info schletter co uk CompactDirect Mounting Instruction Prepare bolt joints if using hanger bolts as fasteners Loosen upper nut and regulate lower nut to align height of fastener Assemble the supports Connect support strut to support base using bolt M8 with nut M8 Tighten remaining bolts on the support Secure support base Fold out support and position it on the fastener Secure support base...

Страница 4: ...he calculation documentation Module mounting Position first module to end of the profile Fasten module with two end clamps in our example click in the Rapid end clamps and tighten screws 6 Lobe T40 Position further modules and secure each by placing two middle clamps respectively between two modules Secure last module of a row with two end clamps Further information relating to mount ing of fasten...

Отзывы: