
EN
2
© Schletter GmbH
•
Gewerbegebiet an der B15
•
Alustraße 1
•
83527 Kirchdorf/Haag i. OB
•
Germany
•
Tel.: +49 8072 9191-200
Fax: +49 8072 9191-9200
•
E-mail: [email protected]
•
www.schletter.eu
•
Updated 11/2012
•
Subject to change without notice
Your contact in the UK: Schletter UK Limited, Tel.: +44 1296 461 800, Fax: +44 1296 461 801, E-mail: [email protected]
CompactDirect Mounting Instruction
Mount fasteners
•
Information relating to mounting of
fasteners can be taken from the type-
specific or from the generic mounting
instructions. Mounting and Project
Planning
Define the area of installation
•
Concentrate the number of fasteners
in edge and corner zones.
•
Please observe further recommenda-
tions from the structural analysis.
Calculation formula:
e = min (x / y or 2
.
h)
x
y
e/4
e/4
e/10
e/10
e/10
e/10
e/4
e/4
h
Building
Position fasteners
•
Note measurement
A
.
•
Please observe the shading distances
B
between module rows. These can be
taken from the calculation docu-
mentation (or, for example, from our
shade calculator, available on our
website.
A
A
B
Corner zone
Edge zone
Corner zone
Field zone
Edge zone
Edge zone
Corner zone
Edge zone
Corner zone