background image

Installation, Mounting and Maintenance DISA-B

Z11/36 - 9

Construction subject to change.

No return possible!

09.05.2014

Version:

Air ducts and plenum box

Clean them with an industrial vacuum cleaner or steam cleaner

or by spraying them with a non-aggressive cleaner.

Registers

To guarantee the technical characteristics of the device, the reg-

isters and heat exchangers must be kept in good clean condi-

tion. To ensure this, the following maintenance activities must

be carried out:

- Remove the secondary air grille as described above. 
- If the register is dirty, clean it by spraying it with water or

compressed air or by evacuation.

- Please do not use any scouring agents for cleaning since

they may impair or damage the materials of theMainte-

nance DISA-B (galvanised steel, aluminium and copper)

and the surface coatings (paints and anodised surfaces).

- If there are larger differences in distance between the ribs,

they must be "aligned".

- Ventilate the hydraulic circuits of the register. In doing so,

watch out for possible leaks of the hydraulic system.

For reasons of safety, the power supply and hydrau-

lic circuit must be disconnected prior to any main-

tenance activity.

When decommissioning the unit or shutting it

down for a longer period in winter, the water must

be drained from the unit, in order to avoid damage

to the register due to the formation of ice. If you

want to use antifreezes, you must first determine

the freezing point.

After recharging the register, the installer has to

make sure by means of on-site ventilation devices

that no air remains in the hydraulic circuit.

Содержание DISA-B

Страница 1: ...Ferdinand Schad KG Steigstra e 25 27 D 78600 Kolbingen Telephone 49 0 74 63 980 0 Fax 49 0 74 63 980 200 info schako de www schako de Installation Mounting and Maintenance DISA B DISA B...

Страница 2: ...tion of the delivered model 4 Function 4 Installation and commissioning 5 Operating conditions 5 Material reception 5 Transport lifting and handling 5 Storage 5 Installation 6 Mounting 6 Hydraulic con...

Страница 3: ...acement of defec tive materials Recycling The inspection installation hydraulic connection and com missioning of the device must be carried out by qualified skilled personnel only in compliance with t...

Страница 4: ...nd heating or optionally 2 pipe system cooling or heating The registers consist of cop per pipes 12 mm in thickness aluminium ribs a steel frame and a manual ventilation and drainage system Grid 3 Lou...

Страница 5: ...150 Total length 1150 mm M Position of primary air plenum box central WS1 Water connection left AS1 Number of connection pipes 1 connection pipe arranged cen 123 Diameter of the connection pipes 123 m...

Страница 6: ...ory authori ties and adjusted in height later on Hydraulic connections Make sure that places that are intended as openings for air admission and air discharge are free of pipes electric cables crossbe...

Страница 7: ...rature controls The temperature controls are mounted in accordance with the selected model This is why the instructions enclosed with each model must be followed However in order to achieve optimum me...

Страница 8: ...e access for carrying out the maintenance activi ties has been provided Use the on site ventilation device to ensure that no air re mains in the register and the circuit The connecting and fastening e...

Страница 9: ...y may impair or damage the materials of theMainte nance DISA B galvanised steel aluminium and copper and the surface coatings paints and anodised surfaces If there are larger differences in distance b...

Страница 10: ...ressure transducer must be closed again The values read on the meter and the following formula can be used to to determine the volumetric flow V l s Primary air flow Ps Pa Static pressure The K value...

Страница 11: ...draulic system Ventilation of the hydraulic system Please inform the installer Installed unfavourably or malfunctions at the temperature control or sensor Install thermostat in a different place Clogg...

Отзывы: