background image

– 4 –

per shaft) to support the heddle bars. 

Slip the hooks through the holes near 

the center of the top and bottom shaft 

frame. Bend the heddle bar slightly to 

snap it into the hook.

7. 

 Insert the shafts back into the 

castle from the bottom of the castle. 

Put the shaft levers in the up posi-

tion. Attach the shaft lever cords to 

the levers (see Figure 4). Note: you 

can determine which lever you want 

tied up to the first shaft (i.e. the right 

side or the left side) at this time. On 

4 shaft looms the cords from the first 

and second shafts go over the front 

small dowel in the top of the castle 

behind the levers. The cords from the 

third and fourth shafts go over the 

rear small dowel. Similarly on 8 shaft 

looms the first and second cords go 

over the front dowel, the third and 

fourth go over the second dowel, the 

fifth and sixth go over the third dowel, 

and the seventh and eighth go over 

the rear dowel. Adjust the shafts to 

a height of 5¼" below the top of the 

castle. This measurement is from the 

top of the harness side to the top of 

the castle (see Figure 5). 

Note: The correct position for an ac-
tive lever is pointing toward you. If 
you pull the lever down too far it will 
interfere with the operation of the 
beater. 

8. 

Place the beater assembly onto the 

bolts that are screwed to the inside of 

the loom base. The wing nuts on the 

beater should be facing forward. To 

insert the reed into the beater, loosen 

the two wing nuts and raise the top 

of the beater, place the reed centered 

in the slot, slide the top of the beater 

down and secure the wingnuts.

FIGURE 5: SHAFTS/CASTLE

5 ¼”

Castle

Shaft

FIGURE 4: LEVERS

Lever Cord

Lever

Front 

Dowel

Rear Dowel

Отзывы:

Похожие инструкции для TABLE LOOM