– 2 –
– 3 –
tie-ups (8-1/8"):
80 for 36" loom, 96 for 45" loom
3X
extra 8/32" hex nuts for shafts
1X
brass reed hook
1X
11" boat shuttle & bobbin
TOOLS REQUIRED
7/16" or adjustable wrench
1/2" and 9/16" wrenches or 2 adjustable
wrenches
rubber mallet or hammer and scrap wood
SCHACHT STANDARD FLOOR LOOM
TM
A
ssembly
i
nstructions
PARTS
Wrapped onto warp beam:
3X
apron bars
2X
lease sticks
Accessory packs:
1000X heddles
1X
warp beam crank handle
1X
1/2" cap nut
1X
1/2" USS washer
apron cords:
14X
33" cords for 36" maple loom
18X
33" cords for 45" maple loom
2X
360" cords for 36" cherry loom
2X
480" cords for 45" cherry loom
HIGH CASTLE LOOM IN CHERRY
front square
beam
upper
side brace
front leg
lower
side brace
treadles & treadle support
castle
cloth beam
brake release pedal
back beam brace
& fold knob
ratchet
advance lever
back square
beam
warp beam
warp beam
crank handle
beater
lamms
rear leg
See Figure 2 (page 4) and Figure 7 (page 7) for detail diagrams of brake and beater.