OPM 200 en-GB
29
©
Scania CV AB 2014, Sweden
Inspection
Engines with few hours of op-
eration
IMPORTANT!
On engines with few hours of operation, inspec-
tion must be carried out annually or every 5
years.
Stand-by generator sets and the like that are not
used regularly should be test run and checked in
accordance with the manufacturer's instructions.
The following inspection points must be carried
out once the engine has been warmed up to oper-
ating temperature.
1.
Checking oil level.
2.
Checking coolant level.
3.
Checking vacuum indicator.
4.
Checking fuel level.
5.
Checking for engine leaks.
Cleaning the engine
The engine must be cleaned before starting work.
Clean the engine with hot water. Also use a de-
greasing agent, if necessary.
Avoid spraying water on the engine control unit,
see illustration.
WARNING!
Beware of hot water! Use suitable protective
equipment.
Environment
The washing water must be disposed of in com-
pliance with the relevant national and interna-
tional regulations.
3
1
2
1
5
2
Clean within the marked area
Property of American Airlines