![Scag Power Equipment GC-2B Скачать руководство пользователя страница 12](http://html1.mh-extra.com/html/scag-power-equipment/gc-2b/gc-2b_operators-manual_1205810012.webp)
R
Section 4
4.1 MAINTENANCE CHART - RECOMMENDED SERVICE INTERVALS
* Perform these maintenance procedures more frequently under extreme dusty or dirty conditions.
MAINTENANCE
HOURS
Break-In 8 20 40 100 200 500 Procedure
Comments
(First 10)
X
Check all hardware for tightness
X
Inspect hose and adapter
X
Check belt for proper alignment
X
Inspect fabric bags
X
*Check screen in hopper
Remove debris from screen
X
Inspect hose and adapter
X Inspect
fabric
bags
X
Check condition of blower
X
*Apply grease to blower bearings
See figure below
X
Check belt for proper alignment
GREASE FITTING
ON BEARING HOUSING
GREASE FITTING
ON BEARING HOUSING
BEHIND PULLEY