background image

 

 

Содержание B10 SX

Страница 1: ...ent SBM 3 cottages de la Norge 21490 CLENAY France 1 GAS INFRARED HEATERS SX USER INSTRUCTIONS N 05000004 5 1 PRODUCT SPECIFICATION 2 SAFETY RECOMMENDATIONS 3 IGNITION 4 SHUT OFF 5 MAINTENANCE 6 CHANGING THE GAS USED ...

Страница 2: ... 7 60 10 20 10 20 13 50 13 50 20 25 27 00 G20 consumption Natural gas m3 h 0 265 0 350 0 400 0 540 0 715 0 805 0 805 1 080 1 080 1 430 1 430 2 145 2 860 G31 consumption Propane kg h 0 195 0 260 0 300 0 400 0 530 0 595 0 595 0 800 0 800 1 055 1 055 1 590 2 110 Combustion air G20 2 60 3 40 3 90 5 30 7 00 7 90 7 90 10 50 10 50 13 90 13 90 21 00 27 80 m3 h G31 2 30 3 10 3 60 4 80 6 30 7 10 7 10 9 60 9...

Страница 3: ...VOID ABNORMAL MECHANICAL CONSTRAINTS ON THE RADIANT IT IS RECOMMENDED THAT IT BE CONNECTED TO THE GAS MAINS BY A FLEXIBLE TUBE TO BE INSTALLED IN WELL VENTILATED PREMISES NOT FOR DOMESTIC USE 2 1 HEATER INCLINATION 2 2 MINIMUM SAFETY CLEARANCES INFLAMMABLE MATERIALS max 70 C For minimum 20 inclination GAS SUPPLY 10 to 35 10 to 35 WRONG INCLINATION CORRECT INCLINATION 1m min 2m min HEATED AREA HEAT...

Страница 4: ...d call your SBM installer Automatic control VisioLon Ind T control module Open the main gas valve Switch the power on Check the settings temperature time Change module programming if necessary 4 SHUT OFF Close the main gas valve Switch the power off 5 MAINTENANCE To be performed once a year by your SBM installer according to the SBM SX INSTALLER INSTRUCTIONS No 05000048 6 CHANGING THE GAS USED For...

Страница 5: ......

Страница 6: ...TO BE DISPLAYED NEXT TO THE CONTROL UNIT ...

Страница 7: ... main gas valve Switch the power on Start the heater ignition cycle If the flame is not lit after 45 seconds start a second ignition cycle If the flame is still not lit or goes out close the main gas valve switch the power off and call your SBM installer SHUT OFF Close the main gas valve Switch the power off MAINTENANCE To be performed once a year by your SBM installer according to the SBM SX INST...

Страница 8: ...CONTROL UNIT A U T O M A T I C C O N T R O L VisioLon Ind T module IGNITION Open the main gas valve Switch the power on Check the settings temperature time Change module programming if necessary SHUT OFF Close the main gas valve Switch the power off MAINTENANCE To be performed once a year by your SBM installer according to the SBM SX INSTALLER INSTRUCTIONS No 05000048 ...

Отзывы: