4
BLOWER OPTION INSTALLATION
A thermal switch must be installed for proper blower operation. To do so, follow these
steps.
WARNING: ENSURE THAT THE POWER IS OFF BEFORE STARTING
INSTALLATION.
1-
Remove the 4 screws (Q) of the junction box’s localization cap
(R)
. Save the screws.
2-
From the rheostat, bring the cable
(S)
(14/2 AWG) from above and through the
opening in the air distribution box.
3-
From your electrical panel, bring a cable
(T)
(14/2 AWG) through the same opening
as the
Step 2
.
Caution:
make sure that the two cables
(S)
and
(T)
comply with all minimum
clearances to combustibles specified in
the manual or on the certification plate of
the fireplace, then attach them to the wall
structure to prevent them from coming into
contact with a hot part of the fireplace or
air distribution system.
Содержание AC01387
Страница 7: ...7 Wiring diagram S T...