First Inflation of Sled
• Now close the valves – from open position push centre/poppet (usually yellow) inwards
and rotate quarter turn in either clockwise or anti-clockwise direction, release gently to lock
in the closed position. (See more information about valve operation above.)
•
Inflate the two compartments partially (using manually operated pump provided), again
allow fabric to “form”
•
After 3/4 minutes fully inflate firstly the floor so that the pressure relief valve operates
•
Carefully look at the pressure required on the outer face of side wall valve – if non-printed
on valve then inflate carefully to 0.25 bar / 3.6 psi / 24.82 Kpa. Go up to the stated
pressure, but do not over pressure so that they form a good almost “hard” shape
•
The pump provided has a low and high pressure setting and a gauge to assist with
inflation.
•
When inflation is done for the first time allow the fabric to “rest” in the warmth of a room to
become the shape of sled and remove any indentations that may have formed in
transport.
•
Recheck inflation of chambers.
• Ensure valve caps are inserted and locked in place by pushing slightly then
turning clockwise (release by turning anticlockwise and pulling away).
• Leave sled inflated for 24 hours the first time, and then re-check that the
sled is at or near the correct pressures. If pressure is not held please see
below
Содержание Aquatic Sled
Страница 1: ...USER MANUAL...