22
Ceiling Lift Track Bridge Owner’s Manual
Part No. 001300-EN, 07-m01-2022
Recommended Dealer Maintenance Schedule
It is recommended for an Authorized Savaria Dealer to perform the
checks/actions listed in the Operator Maintenance Schedule as well as those
listed in the table below.
Reset the recommended maintenance counter following the
yearly maintenance.
To avoid potential injury, use ONLY Savaria parts when
replacing parts.
To prevent the person from falling (or objects from
falling) that may cause injuries to the person, the
operator or other persons, always reinstall the track end
stops if they were removed for servicing. Note that the
recommended tightening torque for the track end stop is
20 N-m (15 lb-ft). Figure 13 shows the track end stop.
Figure 13
Dealer Check/Action
Frequency
Check all inside hardware to ensure it is properly tightened
Every year
Check the connection points of the tracks to the Bridge
Every year
Check the wiring and connectors for proper connection
Every year
Perform a load test on the Bridge and track system with the
Safe Working Load
Every year
NOTE
DANGER
TRACK END STOP
Содержание Ceiling Lift Track Bridge
Страница 29: ...THIS PAGE WAS LEFT INTENTIONALLY BLANK ...
Страница 30: ...THIS PAGE WAS LEFT INTENTIONALLY BLANK ...
Страница 31: ...THIS PAGE WAS LEFT INTENTIONALLY BLANK ...