background image

Savant ITP-E5500x-30 QRG | 009-1935-01 

2     of     2

45 Perseverance Way, Hyannis, MA 02601

200609 | © 2020 Savant Systems, LLC

Savant.com

  |  508.683.2500

Installation

The Savant 5.5 inch In-Wall Touch Screen is designed to be installed in 

a single gang configuration. 

 IMPORTANT!

 Box should be oriented using the portrait format 

(screw holes oriented at top and bottom).

Mount the Bracket

The Savant In-Wall Touch Screen is designed to be mounted using 

either a standard 1-gang electrical box or low voltage 1-gang bracket.
1.  Mount a 1-gang standard electrical box or low voltage bracket to an 

existing wall. Recommended height to center of box is between 57 

and 65 inches (145 – 165 cm) above a finished floor. 

1-gang 

electrical box

     

1-gang low 

voltage bracket

2.  Secure the mounting bracket to the electrical box/bracket using 

the two 6-32 x 1 inch screws provided. Position the touch panel 

mounting tabs facing outward. See image below. 

Tabs Face 

Outward

Mounting

Bracket

Make Connections

Connect a Cat 5e/6/7 Ethernet cable (T568A, T568B) to the RJ-45 

LAN/PoE port on rear of touch panel. See image below.

Local 

Network

To LAN/PoE Port

(RJ-45)

To Router

(PoE)

 IMPORTANT INFO!

 

The touch screen is powered through the Ethernet cable. An 

802.3af compliant PoE network router is required to power the 

display.

 

If a PoE network router is not available, a PoE network injector 

can be used.

Secure Panel to Bracket

Once cables are connected to rear of touch panel, the panel can be 

secured to the mounting bracket installed earlier.
1.  Loosen the captive screws on the top and bottom of the touch 

panel a few turns to allow the panel to slide into the mounting 

bracket.

2.  Insert the touch panel into the mounting bracket. Ensure the tabs 

on the mounting bracket are inserted into the appropriate slots in 

the touch panel.

3.  Tighten the two captive screws to secure the touch panel to the 

mounting bracket. 

3

Loosen captive screws 

(top and bottom)

Tighten captive screws 

(top and bottom)

Slide touch panel 

into slots in 

mounting bracket

2

1

 TIP!

 When installing, the proximity sensor located on the front of 

the display should be positioned towards the top.

Apply Power

The ITP-E5500x-30 is powered through the Cat 5e/6/7 Ethernet cable. 

Plug the opposite end of Ethernet cable into the network router (PoE 

enabled). Connecting the Ethernet cable will power-on the touch 

panel and an IP Address automatically gets assigned through DHCP.
Once the touch panel is powered and an IP address is assigned, it can 

be added to a RacePoint Blueprint configuration. Refer to the 

Savant 

In-Wall Touch Screen Deployment Guide

 (009-1475-xx) available on 

the 

Savant Customer Community

.

Отзывы: