
Step 6
427287
www.sauder.com/service
Page 12
B
D
å
Fasten two CABINET RIGHTS (40CA) to the LEFT
UPRIGHT (D) and two CABINET LEFTS (40CB) to the
LEFT END (B). Use eight GOLD 5/16" FLAT HEAD
SCREWS (3S) through holes #1 and #4.
1
2
3
4
1
2
3
4
Roller end
1
2
3
4
1
2
3
4
Roller end
GOLD 5/16" FLAT HEAD SCREW
(8 used for the RAILS)
3S
This hole
must be here.
This hole
must be here.