background image

 

Make sure that floor will flatten by spreading inside the boat. 

 

 

Insert aluminum stringers between boat tubes and floor sections.  

It is easier to do if you place an oar or paddle between ground and boat bottom, such that it lifts the edge of 

the board off of the ground slightly. 

Содержание TR430-DG

Страница 1: ...he inflation valve is in the open position When the valve is in the open position air will freely move in out of the valve The valve can be opened by pushing in the stem of the valve middle portion in...

Страница 2: ...formed by 2 people at least at the very first few times The keel is usually folded sideways during manufacturer packing For first time installation inflate the keel and position it such way that the a...

Страница 3: ...ing oar on the ground along the boat bottom Then lift that side of the boat up and push the assembled oar slightly under the boat in such a way that the floor boards are slightly elevated This gap wil...

Страница 4: ...Visual Step by Step Instructions for Sectional Floors Inflate boat about 20 and insert front bow section of the floor Insert second and last sections of the floor...

Страница 5: ...Two middle sections will create roof like structure Step on raised part of two connected floor sections...

Страница 6: ...spreading inside the boat Insert aluminum stringers between boat tubes and floor sections It is easier to do if you place an oar or paddle between ground and boat bottom such that it lifts the edge of...

Страница 7: ...Aluminum stringers should interconnect at least two sections of the floor Inflate left and right tube of the boat Use hand pump to finish...

Страница 8: ...Inflate bow section of the boat Use hand pump to finish Last step is to inflate keel of the boat with a hand pump...

Отзывы: