SATRON VOA / VOM
QUICK START GUIDE
Contents:
Installation requirements
Electrical requirements
Calibration Procedures
Страница 1: ...SATRON VOA VOM QUICK START GUIDE Contents Installation requirements Electrical requirements Calibration Procedures ...
Страница 2: ...r NRT B0T housing M12 Connector 2 2nd 4 20mA loop 3x digital input 3x digital output M12 Connector 1 Power 24VDC 250mA Turbidity 4 20mA active loop H0T housing L0V housing Cable to probe PIN 7 8 9 Power 24VDC 250mA Turbidity 4 20mA active loop ...
Страница 3: ...Electrical requirements 24VDC 250mA Cross section of wire 0 34mm2 Housing B0T H0T HRT N0T NRT Housing L0V Analog output signal according to NAMUR NE 043 ...
Страница 4: ...facing down Horizontal on the bottom or side with leak detection port facing down Cable entry direction from below Installing 45 G1 Hygienic Welding adapter M548101 refer to datasheet for welding instructions Tightening torque 60 20 Nm Replacement o ring 17x20mm EPDM FPM FFPM Do not put sealing tape or paste on the threaded connection VO sensor G1 Thread M548101 45 5mm 1 79 ...
Страница 5: ...re hygienic and easy to install but they can trap air that can cause a malfunction Distance from sensor lens to inner pipe wall should be kept to a minimum d1 Minimum pipe diameter 38mm 1 5 Process connection direction Vertical upwards flow Horizontal on the side Cable entry direction from below d1 VO sensor Tri Clamp ...
Страница 6: ...Process valve in this example 30 6 Press Esc to skip 20mA Press Esc to skip 4mA 2 point calibration ...