6. Then we cover it all up and put on the top. If necessary, we put washers under the cross to get the level of the table top
.
Страница 1: ... LUDO 1 Start the assembly with planning the table position then make a trench with dimensions of 800mm x 800mm x 230mm length x width depth 2 Then we level the excavation and insert a concrete pedestal Screw the cross to the pedestal and check the level ...
Страница 2: ...he prefabricated element for the seat and place the blocks as shown in the photo so that the top of the prefabricated element is flush with the ground They should be properly leveled Important when covering the prefabricated element under the stool we translate the soil layers with mortar or cement to further strengthen the substrate 5 The next step is to screw the mounting flat bar inside the sto...
Страница 3: ...6 Then we cover it all up and put on the top If necessary we put washers under the cross to get the level of the table top ...
Страница 4: ......