![Satellite Global II Скачать руководство пользователя страница 8](http://html.mh-extra.com/html/satellite/global-ii/global-ii_assembly-instructions-manual_1200969008.webp)
10/17/2018 REVC
40243 INSTRUCTION- GB II HD EXT
8
Step 10: Assemble Front to Panels.
1.
Install HD Extrusions between the front and panel.
Note:
Fasten front to panels using the same
method as STEP 3 Fasten Extrusion to Side
Panel. (6)Places per side using rivets #18755.
Warning: Do not drill through first layer of
panel or front only.
2.
Repeat on other side.
24
Step 11: Assemble Front to Base.
1.
Fasten Front to
Dirt Buster Base
use (6) screws #13860 through pre-drilled holes in
bottom of door frame.
Install
(2) screws through pre-drilled holes in bottom of door
frame left side & (2) screws through pre-drilled holes in bottom of door frame right side.
2.
Open the door and install the final (2) screws #13860 through two pre-drilled holes
behind the door, near inside edge of frame, (1) left and (1) right side.
19
3