28
Planning your program
Note:
The time of day clock MUST be set to the correct day and time in order for the
programmed times to be correct.
Look at the factory preprogrammed times and temperatures shown in the Factory default
program setting. If this program will suit your needs, simply press the RUN button to
begin running the factory preset program.
If you wish to change the preprogrammed time and temperature, follow these steps:
Determine the time periods and temperatures for your program. You must program four
periods for each day. However, you may use the same heating and cooling temperatures
for consecutive time periods. You can choose heating temperature, cooling temperature
and start time independently. (for example, you may select 5:00 am AND 70º F as the
weekday 1
st
period heating start time and temperature and also choose 7:00 AM and 76º
F as the weekday 1
st
period cooling start time and temperature.
Use the table below to plan your program time periods and the temperatures you want
Содержание T21STK-2
Страница 1: ...1 OPERATING T21STK 2 INSTRUCTION...
Страница 7: ...7 INSTALL THE THERMOSTAT ATTACH THERMOSTAT BASE TO WALL PULL THE COVER OFF THE BASE...
Страница 12: ...12 Wiring Diagrams Figure 3 Typical wiring diagram for heat cool 5 wire two transformer system...
Страница 13: ...13 Figure 4 Typical wiring diagram for heat cool 4 wire single transformer system...
Страница 14: ...14 Note Jumper required in heat pump mode Figure 5 Typical wiring diagram for heat pump with reversing valve...
Страница 20: ...20...
Страница 35: ...35 THERMOSTAT LCD DISPLAY Figure 2...
Страница 36: ...36 THERMOSTAT BUTTONS AND SWITCHES Figure 3...
Страница 38: ...38...
Страница 39: ...39...
Страница 40: ...40...
Страница 41: ...41...