![Sartorius ACCULAB ATILON ATL-124 Скачать руководство пользователя страница 8](http://html1.mh-extra.com/html/sartorius/acculab-atilon-atl-124/acculab-atilon-atl-124_operating-instructions-manual_1199703008.webp)
Installation
Setting Up the Balance
Instruments with sliding-door draft shield:
§
Place components inside the chamber in the following order:
– Draft shield base plate
– Drip/breeze ring
– Pan support
– Weighing pan
Instruments with a round glass draft ring:
§
Position the components listed below in the order given:
– Place the lower lid on the balance with the raised edge facing upwards
– Pan support
– Weighing pan
– Glass draft ring
– Place the upper lid on the draft shield ring with the raised edge facing downwards
Instruments with a round weighing pan
§
Position the components listed below in the order given:
– Pan support
– Weighing pan
Instruments with a rectangular weighing pan:
§
Place the weighing pan on the balance
5
Содержание ACCULAB ATILON ATL-124
Страница 4: ...98648 015 55 Operating Instructions ACCULAB ATILON Electronic Analytical and Precision Balances ...
Страница 57: ......
Страница 58: ......