Saris 26270 Скачать руководство пользователя страница 2

3

Tell Us What You Think

sarisinfrastructure.com/feedback

Register your product for updates

sarisinfrastructure.com/registration

Thanks for purchasing a Saris Infrastructure product!

The rack you are about to install was USA born and bred. The steel came from a foundry in the Midwest and was deliv-
ered to our manufacturing facility in Madison, WI. Under our watchful eye it was bent and welded. After having a finish 
applied locally, it has made its way to you. 

Bicycle racks are amazing pieces of infrastructure. A simple bent piece of steel can unlock the incredible tool the bike 
can become. A secure parking rack makes communities and businesses healthier and happier. They eliminate one of 
the major obstacles for people not choosing to travel by bike: secure bike parking at their destination. So put a smile on 
your face as you place this rack into position because you are making the world a better place. 

Please read and understand the following instructions before beginning your installation. 

Everyone here at Saris wants you to be happy with this product. Please contact us  
([email protected], 800-783-7257) should you need anything.

Содержание 26270

Страница 1: ...OUTDOOR PARKING SYSTEM INSTALLATION Customer Service 800 783 7257 sarisinfrastructure com...

Страница 2: ...are amazing pieces of infrastructure A simple bent piece of steel can unlock the incredible tool the bike can become A secure parking rack makes communities and businesses healthier and happier They...

Страница 3: ...N 25683 Penta Security Socket P N 25680 only needed for temporary secure installation Tools Needed for Installation Installer Provides Tape Measure Masonry Drill Bit Drill Hammer drill recommended Ha...

Страница 4: ...ing the Penta nuts using the Penta socket Use the 7 32 hex wrench to tighten the button head hex bolts 6 Next insert the drop in anchor with the open side up Tap lightly to get the anchor flush with t...

Страница 5: ...Corral Mount III Corral Mount Corral Assembly 1 Level Prop rails up on blocks of wood to provide ample clearance for a socket wrench underneath 2 Line up docks onto rails so that the flange holes line...

Страница 6: ...e concrete 6 1 4 3 Blow the hole clean of dust and other material 4 Drive spike through the rail and into hole until head of spike is seated on the flange mount B Temporary Mount P N 29173 Temporary S...

Страница 7: ...anchor which is When fastening to solid concrete with a drop in anchor a hole must first be drilled into the concrete A hammer drill should be used as it will drill the best quality hole Once the bit...

Страница 8: ...rt it into the anchor Strike the setting tool with the hammer several times until the set tool ill ensure the anchor is properly set s For temporary installation you will be using 4 button head hex bo...

Страница 9: ...o be free from defect in material and workmanship for a period of one year from date of purchase Please retain your sales slip for your records Any product or part thereof found to be defective within...

Отзывы: